My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-08-26 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
1998
>
1998-08-26 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 1:08:12 PM
Creation date
8/23/2011 1:07:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Company <br /> CONSULTING ENGINEERS Formerly MSA <br /> Consulting Engineers <br /> August 26, 1998 <br /> File: 260094m -0071 <br /> Mr. Jim March <br /> City Administrator <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> RE: LAUIRIE LAMOTTE MEMORIAL PARK <br /> BID RESULTS <br /> Dear Mr. March: <br /> As you are aware, we opened bids yesterday for the Laurie Lamotte Memorial Park <br /> project in Centerville. We have attached a complete summary of the bid results to this <br /> correspondence. Below is a summary of the base bid results: <br /> Forest Lake Contracting $153,227.90 <br /> Dresel Contracting $186.299.00 <br /> Glenn Rehbein Excavating $191,077.45 <br /> Lakeland Nurseries $315,303.00 <br /> We talked to a representative from Forest Lake Contracting after the bid opening. They <br /> have resources available immediately to begin work on the project if the Council is <br /> prepared to award the project. <br /> There are several items that need attention on this project. We have outlined these <br /> below: <br /> • An electrical power cut for the well needs to be completed. The City should consider <br /> reinstallation of the meter for the well on the wall of the building at the park. <br /> • The City of Centerville should consider lighting for the proposed parking area. The <br /> City would enter into an agreement with NSP on this work. It would be important to <br /> determine the locations of the light standards prior to final grading of the parking lot. <br /> • The small storage shed on the west side of the building should be moved and <br /> disposed of if necessary by the City. <br /> There are a number of other smaller site work items that should also be addressed such <br /> as whether or not to salvage any of the parking lot aggregate, and removing items on the <br /> site such as garbage cans, foul posts, and the snow fence. We will continue to <br /> coordinate these efforts with the City Public Works staff. <br /> 11 SPNWFSIVOLIIDATA \PROJ�260094m100711094 -2609. aug.doc <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 612/644 -4389 fax 612/644 -9446 toll free 888/368 -4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.