Laserfiche WebLink
Woods of Clearwater Creek <br /> Development Agreement DRAFT August 27, 1998 <br /> surfaces. The Developer shall provide street sweeping within 24 hours of <br /> the City's request for such services. <br /> 6) Provide for landscaping in accordance with City ordinances and other <br /> requirements <br /> The Developer shall accomplish or cause to be accomplished these actions <br /> according to generally accepted trade standards. The Developer will cause to be <br /> furnished to the City a schedule of proposed operations at least five days prior <br /> to commencement of his construction activities. <br /> Construction vehicles for site grading, streets, and utilities will utilize the <br /> existing blacktop surface on 20` Avenue to access the site. At no time shall <br /> vehicles associated with the plat development be allowed to access the site from <br /> Brian Drive. <br /> b. Site Grading Street Construction and Building Permits No certificate of <br /> occupancy shall be issued without installation of bituminous base course across <br /> the front lot line of that property. No building permit shall be issued for any lot <br /> without the finished grading in accordance with the approved grading plan. <br /> No building permits will be issued until the rough grading for the site has been <br /> completed and approved by the City Engineer. Furthermore, only one building <br /> permit will be issued prior to installation of the bituminous base course, and this <br /> permit shall be at the discretion of the City, to allow for emergency vehicle <br /> access. <br /> C. Erosion Control The Developer shall control erosion insuring: <br /> 1) All development shall conform to the natural limitations presented by the <br /> topography and soil of the subdivision in order to create the best potential <br /> for preventing soil erosion. The Developer shall submit an erosion control <br /> plan, detailing all erosion control measures to be implemented during <br /> construction. Said plan shall be approved by the City prior to the <br /> commencement of site grading or construction. <br /> 2) Erosion and siltation control measures shall be coordinated with the <br /> different stages of development. Appropriate control measures as required <br /> by the City shall be installed prior to development when necessary to <br /> control erosion. <br /> 3) Land shall be developed in increments of workable size, as determined by <br /> the City, such that adequate erosion and siltation controls as directed by <br /> the Engineer can be provided as construction progresses. The smallest <br /> practical area of land, as determined by the City, shall be exposed at any <br /> one period of time. <br /> Page 3 <br />