Laserfiche WebLink
DEC -O7' 98 (M)N) 14 :17 3ARNA GCZY MCF; E TEL :612 780 1 7 77 P, 003 <br /> a. Shade trees (balled and burlapped) <br /> 1 per lot or 2 per comer lot at $300 each x 5 lots $1,500 <br /> b. Sod, 600 square yards per lot at $$00 per lot x 5 $4,000 <br /> C. City administration for review and compliance $ 500 <br /> Total Estimated Cost $6,000 <br /> All of the above items under Section B with the exception of the trees and sod on <br /> unbuilt lots shall be completed and/or provided to the City by <br /> 19 <br /> 2. Also included as items associated with the Private Improvements, the Developer <br /> shall undertake or arrange to accomplish the following: <br /> a. Site Development Issues <br /> i. Coordinate with the utility companies to provide for gas main, <br /> telephone lines, cable lines, and power lines to service the <br /> properties developed on the final plat according to the City's joint <br /> trench policy. <br /> ii. Provide seeding and vegetation maintenance and erosion control <br /> over denuded or graded areas and mitigation area, at the City's <br /> direction. <br /> iii. Establish lot confer monttmentation within 60 days of grading <br /> completion or within a/ o days after filing the fatal plat, <br /> whichever is sooner. <br /> iv. Provide such street maintenance and control of builder's actions to <br /> maintain roadways clear of mud, soil, and debris to provide safe <br /> driving surfaces. The Developer shall provide street sweeping <br /> within 24 hours of the City's request for such services. <br /> V. Provide for landscaping in accordance with the City ordinances <br /> and other requirements. <br /> The Developer shall accomplish or cause to be accomplished these actions <br /> according to genera;ly accepted trade standards. The Developer will cause <br /> to be furnished to the City a schedule of proposed operations at least five <br /> days prior to commencement of the construction activities. <br /> 2 <br />