My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-25 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-06-25 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 3:29:23 PM
Creation date
8/26/2011 3:13:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jim March <br /> June 17, 1997 <br /> Page 2 <br /> The estimated cost for this option is: <br /> Heritage Street (630 ft of street): $7,125.00 <br /> Lamotte Drive (1135 ft of street): $13.785.00 <br /> Total Construction Cost $20,910.00 <br /> Option 3 - Mill and 3" Overlay <br /> Option 3 includes milling the full thickness of existing pavement, leaving millings in place, and <br /> overlaying with three inches of bituminous. The bituminous millings would be graded and <br /> compacted to act as an aggregate base for the overlay. This option would offer added <br /> support over just an overlay, from the even base of compacted bituminous millings. This <br /> option, however, may also only be temporary depending on the geotechnical properties of <br /> the subbase, especially in the problem areas. Additional soil correction in the problem areas <br /> may make this option more suitable. <br /> The estimated cost for this option is: <br /> Heritage Street: $19,740.00 <br /> Lamotte Drive: $34.120.00 <br /> Total Construction Cost $53,860.00 <br /> Option 4 - Full Reconstruct with Bituminous Curb <br /> Option 4 includes removing the existing pavement and problem soils under the existing <br /> pavement, and adding a 6" Class 5 base, 3" bituminous surface, and bituminous curb. This <br /> option would offer the greatest support for a new pavement surface and would offer the best <br /> driving surface. This option does not include any cost for storm sewer, but could be added <br /> as needed. <br /> The estimated cost for this option is: <br /> Heritage Street: $23,305.00 <br /> Lamotte Drive: $40.635.00 <br /> Total Construction Cost $63,940.00 <br /> Howard R. Green Company <br /> CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.