My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-04-09 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-04-09 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2011 3:04:36 PM
Creation date
8/29/2011 3:04:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MS1 April 3, 1997 <br /> File: 260 - 095 -20 <br /> COISCL 5 ' <br /> Mr. Jim March <br /> 1326 Energy Park Drive Administrator <br /> Sl, Paul, MN55108 City of Centerville <br /> 612644 -4389 1880 Main Street <br /> 1.800 Centerville, MN 55038 <br /> Fax: 612-644-9416 <br /> RE: 1997 SEAL COAT PROJECT <br /> Dear Mr. March: <br /> We have completed our estimate of the construction costs for the proposed 1997 seal coat <br /> project in Centerville. Each part of the proposed project, with the exception of Mill <br /> Road, is shown on the attached exhibit. Below is a summary of the the estimated costs <br /> for each part of the project, based on prices for the 1995 Seal Coat project and <br /> discussions with seal coat contractors: <br /> CIVIL ENGINEERING: Royal Meadows Streets $ 4,200 <br /> ENVIRONMENTAL Acorn Creek Streets 8,000 <br /> MUNICIPAL Peltier Lake Drive (Main Street to Centerville Road) 4,000 <br /> NNING Mound Trail 6,500 <br /> SouoWASTE City Parking Lot 2.000 <br /> STRUCTURAL Sub -total $24,700 <br /> SURVEYING Mill Road C fclL,- l,,Y, I k,w 44 4.200 <br /> TRAEPIC Total with Mill Road $28,900 <br /> TRANSPORTATION <br /> If the costs for the project are less than $25,000, state rules allow the project to not be <br /> EEECTRICAUMECHANUAL publically bid. However, because the costs are estimated to be so close to $25,000, we <br /> ENGINEERING: recommend bidding the project. We will advertise the project for bids at the direction <br /> HVAC of the City Council. The project would be completed sometime in June of this year. <br /> POWER DISTRIBUTION <br /> SCADA We will be in attendance at the April 9th Council meeting to answer any questions the <br /> SISTEu, CONTROLS Council may have about the project. We will discuss whether or not to include Mill <br /> Road in the project at this meeting. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> c� !vim <br /> oPtices IN: David E. Nyberg, E. <br /> NNEAPOUS Project Manager <br /> PRIOR LAKE DEN:tw cc: Mr. Paul Palzer, Centerville Public Works <br /> ST. PAUL <br /> WASECA 095- 0305.apr <br /> M Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.