My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-08-13 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-08-13 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2011 3:24:55 PM
Creation date
8/29/2011 3:24:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZIP <br /> Howard R, Green Company terville <br /> CONSULTING ENGINEERS EstagS W ran <br /> WATERMAIN INTERCONNECTION <br /> ESTIMATED COSTS <br /> Construction Costs <br /> 20th Avenue $175,371.75 <br /> East -West Interconnect $52,353.00 <br /> Meter Vault $67,500.00 <br /> TOTAL $295,224.75 <br /> SANITARY SEWER ESTIMATED COSTS <br /> Construction Costs <br /> 20th Avenue $159,522.75 <br /> Forcemain and Lift Station $103,275.00 <br /> TOTAL $262 <br /> TOTAL CONSTRUCTION COST $558 <br /> 260i085- 1814.feb <br />
The URL can be used to link to this page
Your browser does not support the video tag.