My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-12-22 - CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-12-22 - CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2011 3:49:20 PM
Creation date
8/29/2011 3:49:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B CONTINUTATION <br /> GRADING PERMIT FEES* <br /> 50 cubic yards (38.2 m3) or less ......................... $15.00 <br /> 51 to 100 cubic yards (40 m3 to 76.5 m3) ................. $22.50 <br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $22.50 for the <br /> first 100 cubic yards plus $10.50 for each additional 100 <br /> cubic yards for fraction thereof. <br /> 1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) - $117.00 for <br /> the first 1,000 cubic yards plus $9.00 for each additional <br /> 1,000 cubic yards or fraction thereof. <br /> 10,001 to 100,000 cubic yards (7646.3 m3 to 76455 m3) - $198.00 <br /> for the first 10,000 cubic yards (7645.5 m3) , plus $40.50 for <br /> each additional 10,000 cubic yards or fraction thereof. <br /> 100,001 cubic yards or more (76456 m3) - $562.50 for the first <br /> 100,000 cubic yards, plus $22.50 for each additional 10,000 <br /> cubic yards or fraction thereof. <br /> Other Inspections and Fees: <br /> 1. Inspections outside of normal business hours........ $30.00 <br /> (minimum charge - two hours) * *per hour <br /> 2. Reinspection fees assess under provisions of <br /> Section 108.8 ....... ............................... $30.00 <br /> * *per hour <br /> 3. Inspections for which no fee is specifically <br /> indicated (minimum charge - one -half hour) .......... $30.00 <br /> * *per hour <br /> * The fee for a grading permit authorizing additional work to that <br /> under a valid permit shall be the difference between the fee paid <br /> for the original permit and the fee shown for the entire project. <br /> ** Or the total hourly cost to the jurisdiction, whichever is the <br /> greatest. This cost shall include supervision, overhead, <br /> equipment, hourly wages and fringe benefits of the employees <br /> involved. <br /> 7 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.