IJ __ <br /> tervilte <br /> 19ftU d d 1857 <br /> roisr�n��e��is�s <br /> OTHER (NON- ASSESSMENT) COSTS <br /> Water Availability Charge (AQ : <br /> Water availability charges are the costs to connect to and become a part <br /> of the Centerville water system. This cost pays for the capital costs <br /> associated with water systems such as elevated storage, water treatment <br /> facilities, and maintenance. <br /> r <br /> Property Owner Costs <br /> The individual property owner will be responsible for the connection <br /> between the property line and the individual building. Because of the <br /> many different configurations this cost varies considerably and is difficult <br /> to estimate. Property owners may also have costs associated with taking <br /> individual well systems out of service. <br />