Laserfiche WebLink
CONTRICS I181l -4 _ TIff3 PESgOD TOTALTObATt .:'. <br /> IT&�I <br /> Np. D&SCRfP'rtOP1 LNIT QTY. UtvTF QTY Ml0S3N1' QTY. AMOIAFT . <br /> SCHEDUL 3 0 WATERMAIN <br /> I CONNECT TO EXISTING WATERMAIN EA _ 1. 000.00 0.00 000 000 000 <br /> VALVEMANHOLE EA I 1,800.00 0.00 0.00 0.00 0.00 <br /> 3 CREEK CROSSING 'A' LS 1 4,000.00 0.00 0.00 0.00 0.00 <br /> 4 CREEK CROSSING'S' LS I 4,500.00 0.00 0.00 0,00 0,00 <br /> 5 10' PVC WATERMAIN LF 1,100 15.00 0.00 0.00 0.00 0,00 <br /> 6 6' PVC WATERMAIN LF 1,830 12.00 312.00 3,744.00 312.00 3,744.00 <br /> 7 10' GATE VALVE AND BOX EA 3 650.00 0.00 0.00 0.00 0.00 <br /> 8 6' GATE VALVE AND BOX EA 5 350.00 0.00 0.00 0.00 0.00 <br /> 9 HYDRANT AND GATE VALVE ASSEMBLY EA 9 2,100.00 0.00 0.00 0.00 0.00 <br /> 10 FITTINGS LB 3,015 1.00 150.00 150.00 150.00 150.00 <br /> 11 WATER SERVICE CONNECT EA 31 150.00 0.00 0.00 000 0.00 <br /> 12 V COPPER SERVICE PIPE IF 1,500 7.00 0.00 0.00 0.00 0.00 <br /> 13 GRANULAR FOUNDATION MATERIAL LF 2,764 0.01 0.00 0.00 0.00 0.00 <br /> 14 PROCTOR TEST EA 1 40.00 0.00 0.00 0.00 0.00 <br /> 15 INPLACE DENSITY TEST EA 30 30.00 2.00 60.00 2.00 60.00 <br /> T SC=ULE 3.0 WATERMAIN -TOTAL 3,954.00 3,954.00 <br /> SCHEDUL 4 q NITARY SEWER <br /> I CONNECT TO EXISTING SANITARY SEWER EA 1 900.00 0.00 0.00 0.00 0.00 <br /> 2 CONNECT TO EXISTING SANITARY MH EA 1 1.500.00 0.00 0.00 0.00 0.00 <br /> 3 IACKBORE STEEL CASING PIPE LF 75 150.00 37.50 5.625.00 37.50 5,625.00 <br /> 4 12' PVC SANITARY SEWER(10.12') LF 125 30.00 0.00 0.00 0.00 0,00 <br /> 5 12' PVC SANITARY SEWER 112.14') LF 447 30.00 0.00 0.00 0.00 0.00 <br /> 6 8 PVC SANITARY SEWER (0-8') LF 362 26.00 719.00 18,694.00 719.00 18,694.00 <br /> 7 8' PVC SANITARY SEWER (8 -10') LF n5 26.00 0.00 0.00 0.00 0.00 <br /> 8 3 PVC SANITARY SEWER (10.12') LF 771 26.00 O.W 0.00 0.00 0.00 <br /> 9 8' PVC SANITARY SEWER (12-14') LF 80 26.00 0.00 0.00 0.00 0.00 <br /> 10 SANITARY MANHOLE 10 - 8') EA 10 1,250.00 4.00 5,000.00 4.03 3,000.00 <br /> 11 MANHOLE EXTRA DEPTH (> 8') LF 41 80.00 8.57 685.60 8.57 685.60 <br /> 12 12',4' WYE EA 8 75.00 0.00 0.00 0.00 0.00 <br /> 13 8'x4' WYE FA 23 40.00 18.00 720.00 18.00 7 <br /> 14 4' SERVICE PIPE LF 1.850 6.00 482.00 2,892.00 482.00 2,892.00 <br /> 15 GRANULAR FOUNDATION MATERIAL IF 1.810 0.01 0.00 0.00 0.00 0.00 <br /> 16 PROCTOR TEST EA 1 40.00 1.00 40.00 1.00 40.00 <br /> 17 INPLACE DEVSITY EA 30 30.00 8.00 2Q.00 8.00 240.00 <br /> T SCHEDULE 4.0 SANITARY SEWER -TOTAL 33,896.60 33,896.60 <br /> SCIED=, 5.0 STORM SEINER <br /> I REMOVE IS' C \IP LF W x.00 0.00 0.00 01'2 0.00 <br /> IS' RCP STORM SEWER LF 403 32.00 O.CO 0.00 0.00 0.00 <br /> 3 19' RCP APRO.Y Fn, 4 500..0 0.00 0.00 0.00 0.00 <br /> n:.c!cricv'n60`IG89J; i_.ALS aA(,L'_ °CO-077 -?0 <br />