Laserfiche WebLink
I"ro:�aruccrrr�>,c TTASPER1OIR rotxwmnArc; • !. <br /> » <br /> n�scn►rdTOx = aver 4xs furor ;. +first � Anral€InT' qnr ? AMOUNT' <br /> 7 AGGREGATE BASE CLASS 5 TN 73 7.50 0.00 0.00 0.00 0.00 <br /> 8 BITUMINOUS D/W RESTORATION SY 210 12.50 44.00 550.00 44.00 550.00 <br /> 9 12'PVC WATERMAIN LF 726 30.00 0.00 0.00 725.00 21,750.00 <br /> 10 6' PVC WATERMAIN LF 27 20.00 0.00 0.00 27.00 540.00 <br /> It 12' GATE VALVE AND BOX EA 1 835.00 0.00 0.00 Loo 835.00 <br /> 12 8' GATE VALVE AND BOX EA 1 625.00 0.00 0.00 0.00 0.00 <br /> 13 HYDRANT AND GATE VALVE ASSEMBLY EA I 1,925.00 0.00 0.00 1.00 1,925.00 <br /> 14 FITTINGS LB 1600 1.00 0.00 0.00 1,025.00 1,025.00 <br /> IS WATER SERVICE CONNECTION EA 7 200.00 0.00 0.00 7,00 1,400.00 <br /> 16 i' COPPER SERVICE PIPE LF 210 16.50 0.00 0.00 280.00 4,620.00 <br /> 17 IACK WATER SERVICE EA 7 1,000.00 0.00 0.00 7.00 7,000.00 <br /> 18 GRANULAR BEDDING LF 700 3,00 0.00 0.00 725.00 2,175.00 <br /> 19 TRAFFIC CONTROL LS 1 3,000.00 0.44 1,320.00 1.00 3,000.00 <br /> 20 PROCTOR TEST EA 2 80.00 0.00 0.00 2.00 160.00 <br /> 21 INPLACE DENSITY TEST EA 10 40.00 0.00 0.00 0.00 0.00 <br /> T ALTERNATE 3- PETERSEN TRAIL WATERMAIN OCrENSION -TOTAL 3,520.10 47,048.60 <br /> SCHEDULE 5 - 0 M AIN STREET WATERMAIN EXTENSION <br /> 1 12' PVC WATERMAIN LF 93 30.00 0.00 0 -00 94.00 2,820.00 <br /> 2 GRANULAR BEDDING LF 93 3.00 0.00 0.00 94.00 282.00 <br /> 3 12' x 8' TEE LBS 340 1.60 0.00 0.00 340.00 544.00 <br /> 4 12' x 8' REDUCER LBS 165 - 1.60 0.00 0.00 0.00 0.00 <br /> 5 8' VALVE EA 1 625,00 0.00 0.00 1.00 625.00 <br /> 6 REMOVE BITUMINOUS PAVEMENT SY I25 2.25 0.00 0.00 0.00 0.00 <br /> 7 CLASS 5 AGGREGATE TON 55 7.50 0.00 0.00 22.00 165.00 <br /> 8 BITUMINOUS WEAR COURSE TON 15 31.00 15.00 465.00 15.00 465.00 <br /> 9 BITUMINOUS BASE COURSE TON 15 28.00 15.00 420.00 15.00 420.00 <br /> 10 CONNECT TO EXISTING EA 2 1,500.00 0.00 0.00 2.00 3,000.00 <br /> 11 REMOVE WATERMAIN LS 1 250.00 0.00 0.00 1.00 250.00 <br /> 12 REMOVE & REPLACE EXISTING CMP LS 1 750.00 0.00 0.00 1.00 750.00 <br /> T SCHEDULE 5.0 MAZY STREET WATERMAIN EXTENSION -TOTAL 885.00 9,321.00 <br /> TOTAL AMOUNT THIS PERIOD 50,864.85 <br /> TOTAL AMOUNT TO DATE 277,235.10 <br /> 2GC072,93.XLS PAGE 3 <br />