My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-09-25 - CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1996
>
1996-09-25 - CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:03:32 AM
Creation date
8/30/2011 11:03:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eagle Pass Development Agreement <br /> e. Flushing of storm sewers, once per year until <br /> all lots are built upon $10,000 <br /> f. Sod yards <br /> 59 lots @ $700/lot $41,300 <br /> g. Street lights <br /> 10 lights @ $2,000/light $20,000 <br /> h. Shade trees balled and burlapped <br /> 1 each @ $500 /each x 59 lots $29,500 <br /> i. City adminstration for review and compliance of <br /> above 80 hours @ $30/hour $2,400 <br /> Total Estimated Cost $124,650 <br /> Developer Retainage (150 %) $186,975 <br /> All of the above items under Section 1 with the exception of the trees and sod on unbuilt lots <br /> shall be completed by <br /> 2. Also included as items associated with the Private Improvements, the Developer shall <br /> undertake or arrange to accomplish the following: <br /> a. Site Development Issues <br /> 1) Coordinate with the utility companies to provide for gas main, telephone lines, <br /> cable lines, and power lines to service the properties developed on the final <br /> plat according to the City's joint trench policy. <br /> 2) Provide seeding and vegetation maintenance and control over denuded or <br /> graded areas and mitigation area, at the City's direction. <br /> 3) Provide street name signs and stop signs. <br /> 4) Establish lot corner monumentation within 60 days of grading completion or <br /> by November 1, 1996, after filing the final plat, whichever is sooner. <br /> 5) Provide such street maintenance and control of builder's actions to maintain <br /> roadways clear of mud, soil, and debris to provide safe driving surfaces. The <br /> Developer shall provide street sweeping within 24 hours of the City's request <br /> for such services. <br /> 6) Provide for landscaping in accordance with City ordinances and other <br /> requirements. <br /> The Developer shall accomplish or cause to be accomplished these actions <br /> according to generally accepted trade standards. The Developer will cause to be <br /> a6oroTS- 2�os.an Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.