My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-24 - CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1996
>
1996-07-24 - CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:28:54 AM
Creation date
8/30/2011 11:28:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I hereby certify that all items and amounts shown by this pay estimate are <br /> correct for the work completed to date. <br /> CONTRACTOR: RO -SO CONTRACTING, INC. <br /> BY: ^(Y� -3)0�,\3jL2rj J— <br /> TITLE: Pp�e'S r () �-nJ , <br /> DATE: -7— / 910 <br /> Based on the ENGINEER'S on -site inspections as an experienced and qualified design <br /> professional and on review of application for payment and the accompanying data and <br /> schedules, the ENGINEER has determined, to the best of his knowledge and belief, <br /> that the quantities shown by this estimate are correct and that, based on such inspections <br /> and review, that the work has progressed to the point indicated (subject to an evaluation <br /> of such work as a functioning Project upon Substantial Completion, to the results of any <br /> subsequent tests required by the Contract Documents, and to any qualifications stated in <br /> his recommendation), and that payment of the amount recommended is due Contractor(s); <br /> but by recommending any payment, the ENGINEER will not thereby be deemed to have <br /> reviewed the means, methods, sequences, techniques, or proceedures of construction <br /> or safety precautions or programs incident thereto or that the ENGINEER has trade any <br /> examination to ascertain how or for what purpose any Contractor has used the monies <br /> paid on account of the Contract Price, or that title to any of the work, materials, or equipment <br /> has passed to the Owner free and clear of any lein, claims, security interests or encumbrances, <br /> or that the Contractor(s) have completed their work exactly in accordance with the Contract <br /> Documents. <br /> ENGINEER: MSA, CONSULTING ENGINEERS <br /> BY: <br /> TITLE: � y °G,ee-- <br /> DATE: <br /> Approved by Owner /Commission <br /> CITY OF CENTERMLE, MINNESOTA <br /> BY: <br /> TITLE: <br /> DATE: <br /> END.XLS <br />
The URL can be used to link to this page
Your browser does not support the video tag.