Laserfiche WebLink
Clearwater Meadows Development Agreement <br /> 5. City administration for review and compliance of <br /> above 40 hours @ $30.00/hour $ 1,200.00 <br /> 6. Shade Trees Balled and Burlapped <br /> 1 each @ $300.00 x 33 lots $ 9,900.00 <br /> Marshel Seedless Ash Trees @ a 2" caliber <br /> (trees are to be "mound" planted) <br /> 7. Flushing of Storm Sewers $ 1,500.00 <br /> Once a year until all lots are built upon <br /> 8. Mass grading of site /including outlots— Performance bond Subcontractor <br /> 9. Sod yards - 33 lots at $750.00 $24,750.00 <br /> 10. Street Lighting - 4 at $2000 $ 8,000.00 <br /> Total Estimated Construction Cost for <br /> Developer's Improvements $ <br /> Escrow Retainage (150 %) $ <br /> All of the above items under section A with the exception of the trees and sod on <br /> unbuilt lots shall be completed by November 1, 1996. <br /> B. Construction of Developer's Improvements financed under 429 process: <br /> 1. The Developer has requested that the City of Centerville undertake the <br /> following improvements pursuant to MS429: <br /> a. Installation of sanitary sewer (2200 LF) and water (2400 LF) <br /> distribution piping <br /> b. Installation of RCP storm sewer of various sizes (470 LF) <br /> c. Installation of urban street (7000 SY) <br /> d. Installation of sidewalk (700 SY) <br /> 2. In addition to the City improvements, the Developer shall undertake or <br /> arrange to accomplish the following: <br /> a. Coordinate with the utility companies to provide for gas main, <br /> telephone lines, cable lines and power lines to service the properties <br /> developed on the final plat according to the city's joint trench <br /> policy. <br /> b. Provide seeding and vegetation maintenance and control over <br /> denuded or graded areas and mitigation area, at the city's direction. <br /> c. Provide 2 street name signs and 2 stop signs and 3 dead end sign <br /> for installation by City staff. <br /> d. Establish lot corner monumentation within 60 days of grading <br /> completion or by November 1, 1996 after filing the final plat, <br /> whichever is sooner. <br /> e. Provide such street maintenance and control of builder's actions <br /> to maintain roadways clear of mud, soil, and debris to provide safe <br /> K- GDEV.WPS Page 2 <br />