My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2011
>
2011-11-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2011 2:21:28 PM
Creation date
11/3/2011 2:21:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec Consulting Services Inc. <br /> 2335 Highway 36 West <br /> St. Paul MN 55113 <br /> Tel: (651) 636 -4600 <br /> Fax: (651) 636 -1311 <br /> Stantec # Bonestroo <br /> October 13, 2011 <br /> Temp. File: 000616- 11000 -0 <br /> 1880 Main Street <br /> Centerville, MN 55038 -9794 <br /> Attention: Dallas Larson, Administrator <br /> Dear: Dallas <br /> Reference: 2012 Street Improvements <br /> At your request, we have prepared a scope of services and fee proposal for the following: <br /> • Feasibility Report for the 2012 Street Improvements <br /> • Plans and Specs for the 2012 Street Improvements <br /> • Bidding Services for the 2012 Street Improvements <br /> Scope <br /> Feasibility Report <br /> We will prepare a feasibility report meeting the requirements of MN Chapter 429 law for the proposed 2012 <br /> street improvements as detailed in the attached CIP prepared by the City's Public Works Director, Paul <br /> Palzer. The streets identified in the 2012 CIP were all included in a previous Feasibility Study completed for <br /> the 2009 Street Improvements Project but did not end up as part of the construction project. Therefore, this <br /> report will simply update the findings of the 2009 report with regard to the treatment of the remaining streets. <br /> We assume that the City will handle all matters relating to calculation of the proposed assessments, <br /> evaluating their viability, and preparation of the assessment roll. We will provide an estimate of the <br /> construction and other project costs for the proposed improvements. <br /> The report figures and cost estimate will only consider the cost of an appropriate pavement rehabilitation and <br /> will not account for maintenance work which will be completed by City staff (or contracted out by the City) <br /> prior to the project including: <br /> • Water Main Bolt Replacements <br /> • Sanitary Sewer Repairs <br /> • Storm Sewer Repairs <br /> • Curb Repairs <br /> • Bituminous Patching <br /> • Draintile Improvements <br /> Preliminary Survey <br /> Based on our discussions of the proposed scope of construction, we do not anticipate the need for any <br /> preliminary topographic survey. If the need for such services arises, we will provide a separate proposal for <br /> that work. <br /> 1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.