Laserfiche WebLink
<br />1- L <br /> <br />MUNICIPAL WATER SYSTEM <br /> <br />A. INTRODUCTION <br /> <br />The City ofCenterville operates a municipal water system consisting of two deep <br />wells (no. 1 at 625 gpm and No.2 at 650 gpm), a 100,000 gallon elevated water <br />tower, and distribution facilities. The layout (constructed or under contract) is <br />shown by Exhibit 2 and the construction andJacilities aging schedule is shown by <br />Table 2. Construction of the water system was iniated in 1987 following <br />preparation of a Water System Master Plan. This plan was subsequently updated <br />in 1989. A further review of connection charges was provided to the City in <br />cotTespondence dated June 1993. These documents provided details and <br />recommendations for future capital improvements. <br /> <br />Presently, the City's municipal water system provides fir distribution mains. We <br />anticipate that within the next 10 years, the system will expand to 115,000 LF of <br />facilities serving 98% of the ultimate population. The City of Centerville haS <br />built an interconnect with the City of Lino Lakes with the ability to have water <br />flow either direction. As part of this agreement, Centerville agreed to install a <br />larger 750,000 gallon water tower by the year 2006. A third well will also be <br />needed during the same time frame. <br /> <br />B. CURRENT STATUS OF FACILITIES <br /> <br />The City's recently installed water facilities have been planned to integrate into a <br />system serving a population of 4,800 residents. <br /> <br />Table 2 - Water System Schedule <br /> <br />Description <br /> <br />Time <br /> <br />Cost <br /> <br />Computerized Maintenance System 3 years <br />Trunk Watermain Construction Annual <br />Elevated Water Tower 2 years <br />Well #3 2 years <br />Update Well Telemetry & Computerized System <br /> <br />$ 15,000 <br />$ 5,000/yr <br />$900,000 <br />$400,000 <br />$ 80,000 <br /> <br />C. WATER SYSTEM MAINTENANCE <br /> <br />Maintenance of the City's water facilities should incorporate the following <br />components: <br /> <br />Action <br /> <br />Frequencv <br /> <br />Hydrant flushing <br />Exercise valves <br />CaIibration of meters <br /> <br />2 times/year <br />2 times/year <br />1/15 years <br /> <br />6 <br />