My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-12-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:55:10 PM
Creation date
2/9/2006 11:04:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ADMINISTRATION <br /> <br />In 1993, the construction of a new City Ha11/Fire Station was completed. The City Hall <br />portion of the building was designed to meet the needs of City staff, City Council, and the <br />community for approximately ten years. <br /> <br />It would be appropriate for the City of Centerville to review the building design to <br />determine if and when any additions should be considered for the future space. The <br />original design allows for future additions on the south and west sides of the building. <br /> <br />The efficient operation of automotive equipment is essential to the day to day operations <br />of City Hall. This equipment is a necessary factor which allows the City to function <br />prOductively with minimal staff. Replacement and repair of this equipment is a high <br />priority. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.