My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-12-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 3:40:29 PM
Creation date
2/9/2006 11:20:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br />. <br /> <br />. . <br /> <br />, aonestroo, Rosene, Anderlik and <br />Associates, Inc. <br />Proposal BBXX-03-MKTG.597 <br />November 18, 2003 <br />Page 2 <br /> <br />Project Proposal <br /> <br />Description and Understanding of Project <br />On behalf of the City of Centerville,.Bonestroo, Rosene, Anderlik, and Assocaites, Inc., has <br />, requested fifteen (IS) soil borings and a geotechnical evaluation for a proposed 2004 roadway <br />reconstruction project. We understand that the project will include pavement reconstruction and <br />utility installation. <br /> <br />Proposed Scope !Jf Services <br />We have. identified several work tasks that will need to be performed to complete the <br />geotechnical evaluation for this project. The tasks are summarized in the paragraphs below. <br /> <br />" <br /> <br />Task 1: Staking Borings and Clearing Utilities. Braun Intertec .will stake the borings and <br />coordinate the clearing of public utilities.' ' <br />. ' <br /> <br />Braun Intertec will contact Gopher State One Gall and request they notify the appropriate utility <br />vendors to clear the underground utilities. We request you or your authorized represe,ntative, <br />notify Braun Intertec.immediately of the presence an~ location of any underground objects C?r <br />private utilities that are not the responsibility of public agencies. Braun Intertec will take <br />, reasonable precautions to avoid underground objects. ' <br />. ' <br /> <br />, Task 2: MobUization/Demobilization and Drilling. As requested, we propose to complete <br />fifteen (IS) standard pene~on borings at th~ approximate locations shown on the sketch <br />provided to us. Penetration tests will be performed at 2 Vz-foot vertical intervals. ,If groundwater <br />is encountered in the borings, the depth were water was encountered will be recorded on the <br />boririg logs. We assume the boring locations are accessible to a truck-mounted drill rig., Our <br />field crew may alter the boring locations from those proposed to facilitate accessibility (due to <br />over-head utility lines, undergr6und utility lines, parked vebJcles, etc;) , <br /> <br />If site conditions c~an~e, such as excessive snow, we have, assumed that provisions will be made <br />by the City to facility accessibility (snow removal). <br /> <br />If existing fill or organic materials are found in the boring~ at depth, it may be 'necessary to <br />extend the borings ~ough these materials. In such cases, the borings would be extended about 5 <br />feet into nativemin,eral soil deposits. This extra billing is necessary for us to evaluate potential <br />excavation depths and soil consolidation characteristics. If deeper borings are needed, we will. <br />contact you for authorization. <br /> <br />The cost for this task includes support truck and drill rig rental, mileage and travel time for the. <br />crew. <br />
The URL can be used to link to this page
Your browser does not support the video tag.