My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-01 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-12-01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:55:31 PM
Creation date
2/9/2006 11:37:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />days of grading completion or within 180 days after <br />filing the final plat, whichever is sooner, winter <br />weather conditions excepted. This monument will <br />be maint.ained by the association of the developer's <br />choiceffown Office Park Association and not the <br />City of Centerville. <br /> <br />IV. Provide such street maintenance and control of <br />builder's actions to maintain roadways clear of <br />mud, soil, and debris to provide safe driving <br />surfaces. The Developer shall provide street <br />sweeping within 24 hours of the City's request for <br />such services. <br /> <br />The Developer shall accomplish or cause to be accomplished these actions <br />according to generally accepted trade standards. To the extent possible, the <br />construction vehicles for site grading, streets, and utilities shall access the site <br />from 20th. Avenue. <br /> <br />b. Site Grading. Street Construction and Building Permits. No certificate of <br />occupancy shall be issued without installation of bituminous parking lot, <br />except buildings started in January and February of2004. Developer shall <br />deposit with the City an escrow or letter of credit in the amount of$76,OOO <br />as security for installation of the bituminous parking lot. <br /> <br />c. Erosion Control. The Developer shall control erosion ensuring: <br /> <br />i. The Developer shall submit an erosion control plan, <br />detailing all erosion control measures to be implemented <br />during construction. <br /> <br />ii. Erosion and siltation control measures shall be coordinated <br />with the different stages of development. Appropriate <br />control measures as required by the City shall be installed <br />prior to development when necessary to control erosion. <br /> <br />iii. Where the topsoil is removed, sufficient arable soils shall <br />be .set aside for respreading over the developed area. The <br />topsoil shall be restored to a depth ofat least four (4) inches <br />and shall be of a quality at least equal to the soil quality <br />prior to development. <br /> <br />d. Inspection. All of the work shall be under and subject to the inspection and <br />approval of the City, City Engineer, and where appropriate, any other <br />governmental agency having jurisdiction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.