My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-01 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-12-01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:55:31 PM
Creation date
2/9/2006 11:37:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. Legal <br />The legal budget was increased substantially this year and is approximately on <br />target. <br /> <br />4. City Hall <br />Due to increased energy costs, city hall plant expenses have exceeded budget. <br /> <br />5. Police Protection <br />Monthly payments are made to the Centennial Lakes Police Department in the <br />amount of $40,379. In addition, $1,500 in charitable gambling donations was <br />passed through for the purchase of medical equipment. <br /> <br />6. Fire Protection <br />Payments are made quarterly in the amount of $20,405.25 to Centennial Fire <br />Department. All four payments have been made in addition to the pass-through of <br />$12,500 in gambling funds. <br /> <br />7. Electrical Inspection <br />The electrical inspection budget was increased this year, but appears to be running <br />over budget. This should not be a concern as fees are collected to offset this <br />expense. <br /> <br />8. Animal Control <br />A n1m3 1 Control expenditures are higher than budget due to a larger than normal <br />number of dogs being impounded. We have increased the budget accordingly for <br />2004, as the trend seems to be continuing. <br /> <br />9. Streets <br />Street expenses exceed budget due to the pavement ml'tnagement study and the <br />Mound Trail project. A portion of the Mound Trail project will be recovered <br />through special assessments. Additional street work can be funded from available <br />capital outlay funds. <br /> <br />10. Parks and Recreation <br />Skate park attendants were not utilized this year, resulting in expenditures below <br />budget in the programs department. <br /> <br />11. Capital Outlay <br />The City installed a security system in the City Hall. We have capitalized the <br />expense, as it meets our capitalization requirements. Capital funds likely to be <br />expended before year-end include the Mound Trail project, 21 st Avenue <br />reconstruction, a copy machine and a folding machine. The public works vehicles <br />will be purchased next year due to the timing of the State contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.