My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-24 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-09-24 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:55:56 PM
Creation date
2/10/2006 10:30:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />put the well on the Anoka County Electrical system. Having the well on a different power <br />source will give the City a higher likelihood that at least one well may maintain normal <br />electric power during power outage situations. <br /> <br />Option 2 - Locate the future well at the Well No.2 site. The advantage of placing the new <br />well on the existing Well No.2 site is the cost savings of not having to acquire and purchase <br />a new site. <br /> <br />Before the new well is drilled, the City should plan to do an aquifer study. This study will <br />help determine if the future well is feasible and that additional water is available at the <br />existing sites. This will also be a good time to search for a new well site along 20th A venue <br />for preparations for land acquisition can begin. <br /> <br />I <br /> <br />27 <br /> <br />Water Tower Feasibility Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.