My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2003
>
2003-09-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:55:59 PM
Creation date
2/10/2006 11:50:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />B. PRIVATE IMPROVEMENTS. The Developer will construct and install at Developer's <br /> expense the general improvement construction according to Ordinance #8 and other <br /> improvements specific to the development herein set forth: <br /> 1. Cost of Private Improvements, description: <br /> a. Street name signs (installed by the City) <br /> approximately ..1... @ $250 each $1,000.00 <br /> b. Traffic signs, stop signs, etc. <br /> (installed by the City) approximately ~ @ $250 $500.00 <br /> c. Utility markers <br /> approximately ~ @ $100 each $200.00 <br /> d. Street sweeping <br /> ~ @ $250.00 each $2,500.00 <br /> e. Lot access graveVsilt fence <br /> ~ @ $500 each/lot $18,000.00 <br /> f. Flushing of storm sewers, once per year until <br /> all lots are built upon -L @ $500.00 each $1,000.00 <br /> g. Street lights <br /> approximately ..1... @ $2,000 $8,000.00 <br /> h. Shade trees (balled and burlapped) <br /> 2 per lot at $200.00 eaclr @ ~(4 for Comer Lot) $17,200.00 <br /> i. Final Grade/Sod, ~ lots @ $2,000/lot $72,000.00 <br /> J. Snowplow service of streets <br /> ~@ $100/plowing $2,000.00 <br /> k. City administration for review and compliance of <br />~ above - ~ hours @ $50 / hour $1,000.00 <br />, <br /> Total Estimated Cost $123,400.00 <br /> Developer Retainage (150%) $185,100.00 <br /> <br />All of the above items under Section B with the exception of the trees and sod on <br />unbuilt lots shall be completed and/or provided to the City by September 30. <br />2004. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.