My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2011
>
2011-12-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2012 11:22:22 AM
Creation date
12/9/2011 1:58:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CENTERVILLE <br />MONTHL Y ENGINEER'S REPORT <br />For the December 14, 2011 City Council Meeting <br />Italia = New information. <br />Normal = No change from last report. <br />1. 21� Avenue /Backage Road (000616- 05143 -0). This matter is pending in the court system <br />2. TE Grant Trail Project (000616- 08165 -0). Construction is complete. We are working with the <br />contractor to resolve any final payment items and should have a final pay request in front of the City <br />Council in the near future. Specifically, we are working with Anoka County and the contractor to <br />resolve the claim for delay due to the state shutdown. <br />3. 2008 Downtown Storm Water Improvements (000616- 08167 -0). The irrigation system was up <br />and running this fall. Next spring, the contractor will be required to restart the system and demonstrate <br />its proper operation again. Once that is complete, the city will take over maintenance and operation. A <br />public viewing of the system is being planned for early next summer. <br />4. Miscellaneous: <br />• We have provided a proposal to complete the Surface Water Management Plan update. <br />• We will be in attendance at the workshop to discuss the pavement management plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.