My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2011
>
2011-12-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2012 11:22:22 AM
Creation date
12/9/2011 1:58:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />ELECTRICAL FEES <br />Individual/separate inspection (installation, replacement, alteration or repair) ........... ............................... $45.00 <br />Services, generators, feeders to separate structures and other power supply resources: <br />1. 0 ampere to and including 200 ampere capacity .............................. ............................... $45.00 <br />2. Each additional 100 amps or fraction thereof .................... ............................... an add'1$10.00 <br />3. For services and circuits operating at over 250 volts .....................(Scheduled fee doubles) <br />Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br />1. 0 ampere to and including 30 ampere capacity ........ ............................... ..........................$8.00 <br />2. 31 amps to 100 amps .................................................................... ............................... $10.00 ea. <br />3. Each additional 100 amps .................................................... ............................... an add') $5.00 <br />One- Family dwelling and each dwelling unit of a two - family dwelling .................... ............................... $175.00 <br />Up to and including 200 amps service (includes not more than three inspections) <br />Multifamilydwellings ................................................................................................ ............................... $100.00 <br />Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders at the <br />abovefees) ................................................................................. ............................... ..........................$3.00 <br />Electrical supply for each manufactured home park lot ...................... ............................... .........................$45.00 <br />Recreational vehicle site, electrical supply equipment ..................... ............................... .........................$10.00 ea. <br />Street, parking lot or outdoor area lighting standards .................................................... ............................... $8.00 <br />Transformers for light, heat and power: <br />I. Up to and including 10 kilo -volt amps ................ ............................... .........................$20.00 ea. <br />2. Over 10 kilo -volt amps ........................................ ............................... .........................$40.00 ea. <br />Transformers and electronic power supplies for electric signs and outline lighting ...... ............................... $8.00 <br />Swimming pool bonding inspection (each separate inspection) ................................... ............................... $45.00 <br />(Bonding conductors and connections require an inspection before being concealed) <br />Retrofit modifications to existing lighting fixtures ................................................ ............................... $.50 /fixture <br />Transient Projects - Power supply fees as identified above, plus 1 hour ........................... ....................$90.00 /hour <br />Each attraction or concession inspection ...................................................................... ............................... $45.00 <br />Special inspection or inspections not covered above the fee is $90.00 per hour plus mileage at the rate <br />established per the IRS. <br />Re- inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected <br />— a fee will be assessed by the inspector ...................................................................... ............................... $45.00 <br />MinimumFee per Trip ................................................................................................. ............................... $45.00 <br />*Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay two <br />times the permit fee, not to exceed $1,000. *For purposes of interpretation, Minnesota Rules, Chapter 3800, <br />Page 12 of 16 <br />.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.