Laserfiche WebLink
<br />The Drilling and Holhizer parcels each have 100 feet of frontage along Mound Trail. The total <br />front footage on the section of street west of Buechler is 730'. <br /> <br />100' + 730' x $29,299 = $4,012 <br /> <br />From the Draft Pavement Management Report, it is recommended that residents be assessed for <br />25% of the cost to reconstruct a street. <br /> <br />$4,012 x 0.25 = $1,003 each <br /> <br />A 15% indirect cost was added for engineering design, project management and construction <br />inspection. <br /> <br />The remaining front footage to the west and north of Lloyd Drilling is Anoka County Park <br />property. This can't be assessed and was therefore shown as a City cost. <br /> <br />The Contractor, Larson Contracting, can perform the work in August or September 2003. The <br />weather has been dry, so the existing Mound Trail pavement should support the truck traffic that <br />will be necessary to rebuild the road. <br /> <br />The City Attorney has reviewed the quote and discussed the proposed work with staff and <br />myself. If it recommended the quote be approved so the work can be done as soon as possible. I <br />can be reached at 651-604-4868 with questions. <br /> <br />Yours very truly, <br /> <br />BONESTROO ROSENE ANDERLIK & ASSOCIATES, INC. <br /> <br />Thomas W. Peterson <br /> <br />TWP:crw <br /> <br />2335 West Highway 36. St. Paul, MN 55113.651-636-4600. Fax: 651-636-1311 <br />