My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-07-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:56:20 PM
Creation date
2/10/2006 2:42:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. Also included as items associated with the Private Improvements, the Developer <br />shall undertake or arrange to accomplish the following: <br /> <br />a. Site Development Issues <br /> <br />1. Coordinate with the utility companies to provide for gas main, <br />telephone lines, cable television lines, and power lines to service <br />the properties developed on the final plat according to the City's <br />joint trench policy. <br /> <br />ii. Provide seeding and vegetation maintenance and erosion control <br />over denuded or graded areas and mitigation area, at the City's <br />direction. <br /> <br />ill. Establish lot comer monumentation within 180 days after filing the <br />final plat. <br /> <br />iv. Provide such street maintenance and control of builder's actions to <br />maintain roadways clear of mud, soil, and debris to provide safe <br />driving surfaces. The Developer shall provide street sweeping <br />within 24 hours of the City's request for such services. <br /> <br />v. Provide for landscaping in accordance with the City ordinances <br />and Developer's approved landscape plan. <br /> <br />The Developer shall accomplish or cause to be accomplished these actions <br />according to generally accepted trade standards. The Developer will cause <br />to be furnished to the City a schedule of proposed operations at least five <br />days prior to commencement of the construction activities. <br /> <br />b. Site Grading, Street Construction and Building Permits. No certificate of <br />occupancy shall be issued without installation of bituminous base course <br />across the front lot line of that property. No building permit shall be <br />issued for any lot without the finished grading in accordance with the <br />approved grading plan. <br /> <br />c. Erosion Control. The Developer shall control erosion insuring: <br /> <br />i. The Developer s~ submit an erosion control plan, detailing all <br />erosion control measures to be implemented during construction. <br />Said plan shall be approved by the City prior to the <br />commencement of site grading or construction. <br /> <br />ii. Erosion and siltation control measures shall be coordinated with <br />the different stages of development. Appropriate control measures <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.