Laserfiche WebLink
EXHIBIT D <br /> ELECTRICAL FEES <br /> Individual/separate inspection ( installation, replacement, alteration or repair) $45.00 <br /> Services, generators, feeders to separate structures and other power supply resources: <br /> 1. 0 ampere to and including 200 ampere capacity $45.00 <br /> 2. Each additional 100 amps or fraction thereof an add'l $10.00 <br /> 3. For services and circuits operating at over 250 volts (Scheduled fee doubles) <br /> Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br /> 1. 0 ampere to and including 30 ampere capacity $8.00 <br /> 2. 31 amps to 100 amps $10.00 ea. <br /> 3. Each additional 100 amps an add'l $5.00 <br /> One- Family dwelling and each dwelling unit of a two- family dwelling $175.00 <br /> Up to and including 200 amps service (includes not more than three inspections) <br /> Multifamily dwellings $100.00 <br /> Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders at the <br /> above fees) $3.00 <br /> Electrical supply for each manufactured home park lot $45.00 <br /> Recreational vehicle site, electrical supply equipment $10.00 ea. <br /> Street, parking lot or outdoor area lighting standards $8.00 <br /> Transformers for light, heat and power: <br /> 1. Up to and including 10 kilo -volt amps $20.00 ea. <br /> 2. Over 10 kilo -volt amps $40.00 ea. <br /> Transformers and electronic power supplies for electric signs and outline lighting $8.00 <br /> Swimming pool bonding inspection (each separate inspection) $45.00 <br /> (Bonding conductors and connections require an inspection before being concealed) <br /> Retrofit modifications to existing lighting fixtures $.50 /fixture <br /> Transient Projects - Power supply fees as identified above, plus 1 hour $90.00/hour <br /> Each attraction or concession inspection $45.00 <br /> Special inspection or inspections not covered above the fee is $90.00 per hour plus mileage at the rate <br /> established per the IRS. <br /> Re- inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected <br /> — a fee will be assessed by the inspector $45.00 <br /> Minimum Fee per Trip $45.00 <br /> *Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay two <br /> times the permit fee, not to exceed $1,000. *For purposes of interpretation, Minnesota Rules, Chapter 3800, <br /> Page 12 of 16 <br /> P60 <br />