My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-11 CC, WS Council Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-01-11 CC, WS Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 9:32:33 AM
Creation date
1/9/2012 9:32:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 10 <br /> Ar . CITY OF CENTERVILLE <br /> 'S <br /> I ` MONTHLY ENGINEER REPORT <br /> terv e <br /> For the January 11, 2012 City Council Meeting <br /> Emablisha lh 7 <br /> Italics = New information. <br /> Normal = No change from last report. <br /> 1. 21 Avenue /Backage Road (000616- 05143 -0). This matter is pending in the court system. <br /> 2. TE Grant Trail Project (000616- 08165 -0). Construction is complete. We are working with the <br /> contractor to resolve any final payment items and should have a final pay request in front of the City <br /> Council in the near future. Specifically, we are working with Anoka County and the contractor to <br /> resolve the claim for delay due to the state shutdown. <br /> 3. 2008 Downtown Storm Water Improvements (000616- 08167 -0). The irrigation system was up <br /> and running this fall. Next spring, the contractor will be required to restart the system and demonstrate <br /> its proper operation again. Once that is complete, the city will take over maintenance and operation. A <br /> public viewing of the system is being planned for early next summer. <br /> 4. Miscellaneous: <br /> • We have provided a proposal to complete the Surface Water Management Plan update. At the <br /> last City Council meeting, the Council directed staff to solicit proposals from other firms for this <br /> work. <br /> • The 2012 Street project has been delayed for consideration at a future date. The series of thin <br /> over /ay projects outlined in the City's updated Pavement Management Plan are to remain on <br /> schedule, beginning in 2013. The City's Public Works Staff will begin preparation work for the <br /> 2013 project in the summer of 2012, by completing: curb replacements, bituminous patching, <br /> water main bolt replacements and other such work which shou /d precede a street overlay. <br />
The URL can be used to link to this page
Your browser does not support the video tag.