<br />2005 Regional Solicitation
<br />"A" Minor Arterial Expander - Rank Order and Cumulative Federal Funds
<br />
<br /> Total Cumulative
<br />Project No. Applicant Project Description Federal $ Total $ Points Federal $
<br />AE-05-1 0 " Dakota County County Slate Aid Highway (CSAH) 23 Expander - ConstNction of a
<br /> slx-lane facllty (south of 153fd Street), intersection upgrades, and
<br /> related roadway improvements to address highway operation and
<br /> accommodate Bus Rapid Transit buses on Cedar Avenue (CSAH
<br /> 23) from 147th Street to 1/4 mile south of 160th Street (CSAH 46).
<br /> 1.5 mUes. $5,500,000 $8,000,000 869 $5,500,000
<br />AE-05-Q3 Hennepln County CSAH 10910025 (Weaver Lake Road/85th Avenue) - Construct
<br /> Second Half of CSAH 109 as a 4-lane Road from East of Main
<br /> Street to East of Jefferson Highway. - Construction of the second
<br /> half of a planned 1.95 mile. 4-lane, divided roadway from east of
<br /> Main Street to east of Jefferson Highway In Maple Grove and
<br /> Brooklyn Park. The existing road Is being used as a two-Iane road,
<br /> until the remaining two lanes can be conslructItd, resulting In a 4-
<br /> lane divided roadway. An off-road, multkJse path win be
<br /> conslNcled on at least one side of the roadway.
<br /> $5.500,000 $7,600.000 792 $11,000,000
<br />AE-OS-01 City of Maple CSAH 30 - CSAH 101 to Dunkirk Lane - The l4lQI'ade of CSAH 30
<br /> Grove to a four-lane divided roadway. Two pedeslrlan/blcycle trails will be
<br /> constructed, one on each side of \he corridor. Includes installation
<br /> ci traffic signals at CSAH 101 and lawndale Lane, 1.68 miles.
<br /> $5,500,000 $9,250,000 788 $16,500.000
<br />AE-05-{)8 Anoka County CSAH 17 (Lexlngton Avenue) Access Management and
<br /> Reconstruction Project - Improvements on a 22 mRe segment of
<br /> CSAH 17 (Lexington Avenue) from CSAIi 14 (Main Street) to 1,000
<br /> feet north of CSAH 116 (Bunker lake Blvd.), recons1rUCtS CSAH 17
<br /> to a six-lane divided roadway within Blaine and to a four-lane
<br /> divided roadway within Ham L.ake. Includes exclusive turn lanes at
<br /> major Intersections, Indudes the constn.K:tIon of separate
<br /> pedestrianlb/cye facIlities along one side of CSAH 17.
<br /> $5.456,000 $6,620,000 774 $21,956.000
<br />AE-OS-Q6 Anoka County CSAH 14 Interchange Reconstruction - (City of Uno Lakes) existing
<br /> CSAH 1411-35E diamond interchange to a diamond interchange with
<br /> e lOOp In the northwest qUadrant, widening of the bridge to
<br /> accommodate a four4ane divided roadway with a trail on one aide.
<br /> accommodate a future park-and-ride In the southeast quadrant of
<br /> the Interchange. The project segment extends one-halt mile from
<br /> 21st Avenue to Otter Lake Road.
<br /> $5,500,000 $9,900.000 751 $27.456,000
<br />AE-05-14 Washington West Broadway Avenue (CSAH 2) Reconstruction. CSAH 21rom
<br /> County 19th Street SW to 12th Street SW and the \-35 interchange.
<br /> Access will be reduced through the Introduction of a raised median
<br /> converting three privata access points Into right inJright out road.
<br /> $5,500,000 $10,200,000 740 $32,956,000
<br />AE-05-16 Scott County Construction on CSAH 21 from CSAH 16 to CSAH 16 - Includes
<br /> paralel trails and a transit pari<-and-ride lot In the southwest
<br /> quachnt of CSAH 16 and CSAH 18. $4.658,800 $5.823.500 714 $37.614,800
<br />AE-OS-OS City of Normandale Blvd. (CSAH 34) - 94th Street to 8500 Block (Nine Mile
<br /> Bloomington Creek)- The upgrade of Normandale Boulevard to a four-lane
<br /> divided roadway with exclusive lelt turn lanes at intersections. A
<br /> two-way trail along the west side of the corridor. T olal project
<br /> length is 0.8 mRea (4,334 feet). $4,880,000 $6,100.000 100 $42.494,800
<br />AE-05-04 Carver County Pioneer Trail Realignment/Reconstruction Project-
<br /> Realigrvnenllraconstructlon of Po-- Tra" from TH 41 to CSAH
<br /> 11. Improvements for a 0.75 mile segment of Pioneer Trail from jU51
<br /> west of TH 41 to west 01 Bavaria Road, extenda the divided four-
<br /> lane sectlon from the TH 41 intersection through BavaI1a Road.
<br /> Includes exclusive turn lanes at key intersecllona and construction
<br /> of a separate pedestrianlblcycle facilities along one side of Pioneer
<br /> Trail. 54,154,400 $5,193.000 696 546,649.200
<br />
<br />38