My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-14 CC Packet (2)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-03-14 CC Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 1:06:49 PM
Creation date
3/9/2012 1:06:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE AID FOR LOCAL TRANSPORTATION June 2008 <br /> CHANGE ORDER Page 1 of 2 <br /> County of Anoka Change Order No. 1 <br /> FEDERAL PROJECT NO. STATE AID PROJECT NO. LOCAL PROJECT NO. CONTRACT NO. <br /> SP 02- 090 -01 2010 -0601 <br /> CONTRACTOR NAME ADDRESS CITY STATE ZIP <br /> Veit, Inc. 14000 Veit Place Rogers MN 55374 -9583 <br /> LOCATION OF WORK: TOTAL CHANGE ORDER AMOUNT <br /> Centerville, MN ($1,585.85) <br /> In accordance with the terms of this Contract, you are hereby authorized and instructed to <br /> perform the work as altered by the following provisions. <br /> This Change Order provides that The Contract requires that the Concrete meet the slump <br /> requirements shown in Special Provision S -13, 2461, Table 2461 -2. <br /> The Concrete material (3Y32A) placed on this project failed to meet the specification <br /> requirements on two (2) tests as evidenced by field slump results. The quantity is summarized <br /> below: <br /> Payment shall be at 75% of the Unit Bid Price per S -13.8 Non Conformance. <br /> Date Field Required Summary of Deduction <br /> Slump Slump <br /> 6/24/2011 4.25" 1 -4" 4" Concrete (567 SF) * ($7.00 /SF) * 25% = ($992.25) <br /> Walk <br /> 6/30/2011 4.5" 1 -4" Pedestrian (1 EA) * ($440.00 /EA) * 25% = ($110.00) <br /> Curb Ramp <br /> Total ($1,102.25) <br /> The Contract further provides that aggregate gradations meet the requirements of MnDOT <br /> Standard Specifications 2461 and 3126. <br /> The Fine Aggregate plant test on 6/27/2011 failed to meet the gradation specification for the #30 <br /> sieve. <br /> In accordance with the MnDOT Materials Disposition, payment will be made at 95% of the Unit <br /> Bid Price for concrete placed between 9:20 am until the end of the pour. <br /> Item # Description Deduct Qty Unit $ Amount <br /> 2521.501 4" Concrete Walk -5% - 960 SF $7.00 _ ($336.00) <br /> 2531.501 B618 Curb /Gutter -5% 64 LF $18.00 ($57.60) <br /> 2531.501 D424 Curb /Gutter -5% 90 LF $20.00 ($90.00) <br /> Total ($483.60L <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.