My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-14 CC Packet (2)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-03-14 CC Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 1:06:49 PM
Creation date
3/9/2012 1:06:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE AID FOR LOCAL TRANSPORTATION June 2008 <br /> WORK ORDER FOR MINOR EXTRA WORK Page 1 of 2 <br /> County of Anoka Work Order No. 1 <br /> FEDERAL PROJECT NO. STATE AID PROJECT NO. LOCAL PROJECT NO. CONTRACT NO. <br /> SP 02 090 - 01 2010 - 0601 <br /> CONTRACTOR NAME ADDRESS CITY STATE ZIP <br /> Veit, Inc. 14000 Veit Place Rogers MN 55374 - 9583 <br /> LOCATION OF WORK: TOTAL WORK ORDER AMOUNT <br /> Centerville, MN $14,991.16 <br /> In accordance with the terms of this Contract, you are hereby authorized and instructed to perform <br /> the work as altered by the following provisions. <br /> 1. On Segment E: The Engineer directed the Contractor to repair the water service at 7216 Mill <br /> Road. This work will be paid by Force Account. <br /> 2. On Segment P2: station 19 +50 the Engineer directed the Contractor to install a new 24" CP <br /> Pipe and Aprons. This will be paid at negotiated unit prices. <br /> 3. On Segment E: The Engineer directed the Contractor to add a new connection to the storm <br /> sewer to drain the yard at 7224 Mill Road. This work will be paid by Force Account. <br /> 4. On Segment E: the Engineer directed the Contractor to repair the curb stop located at <br /> 24 +50. This work will be paid by Force Account. <br /> 5. On Segment E: the Engineer directed the Contractor to regrade and re -sod a 13 "x90' area <br /> at 7288 Mill Road. This work was done to provide positive drainage and it will be paid by <br /> Force Account. <br /> 6. At Main Park: the Engineer directed the Contractor to add 4" PVC sleeves under the <br /> concrete slab for future electric or water connections. This work will be paid by Force <br /> Account. <br /> 7. On Segment P1: The retaining wall conflicted with an underground electric service line. Xcel <br /> Energy had to relocate the service line away from the retaining wall. While this work was <br /> being done, the Contractor completed work on the other segments and de- mobilized from <br /> the project. The Engineer has determined that the cost to re- mobilize to complete Segment <br /> P1 is extra work. Payment will be made at negotiated unit prices. <br /> 8. During the installation of storm sewer on Segment E, the Contractor encountered bad soils. <br /> The Engineer authorized the Contractor to implement the Improved Pipe Foundation HDPE <br /> Pipe detail on sheet C8.02 of the plans. Payment will be made at negotiated unit prices. <br /> 9. On Segment P2 at station 7 +50, the plans called for the salvage and installation of a 24" RC <br /> Pipe Apron. The existing apron was in poor condition and was replaced with a new apron. <br /> Payment will be made at negotiated unit prices. <br /> 10. The Engineer directed the Contractor to install floating silt curtain downstream of Segment L <br /> at station 3 +00. It was determined that the creek should be protected from sediment from <br /> the culvert and pond work in this area. <br /> This work is not expected to become, or affect the Controlling operation. Contract time will not be <br /> altered as a result of this work except as provided in Mn /DOT Specification 1806. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.