My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-14 CC Packet (2)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-03-14 CC Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 1:06:49 PM
Creation date
3/9/2012 1:06:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT TP -21659 (1.93) <br /> STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION <br /> SUMMARY OF DAILY FORCE ACCOUNT <br /> WORK ORDER No. 1 Sheet 1 of 1 <br /> S.P. No. 02- 090-01 Fed Proj No. Contract No. 2010 -0601 Contractor / Sub. Veit Construction <br /> For Period from 8/21/2011 to 8/27/2011 Location CRT Main Park Install PVC Sleeve (EWA 24498) Engineer Stantec Consulting Inc. <br /> LABOR MATERIAL EQUIPMENT RENTAL <br /> # of Men Position Title Hrs OT/Hr Pay Rate Amount No. Kind of Material Rate Amount No. Description otal H ; Rate Amount <br /> 1 Laborer 2.5 0 $ 30.97 $ 77.43 60 LF4" PVC $ 1.10 $ 66.00 1 Cat 247B Skid Loader 1.50 $ 29.76 $ 44.64 <br /> 1 Foreman 0.5 0 $ 30.97 $ 15.49 1 Cat 305 CR Mini Hoe 2.00 $ 27.30 $ 54.60 <br /> N <br /> N <br /> SALES TAX $ 4.70 <br /> SUB -TOTAL $ 70.70 <br /> Total Overtime PLUS 15% $ 10.61 <br /> SUB TOTAL (Taxable Wares) $ 92.91 'TOTAL OF MATERIAL $ 8131 <br /> PLUS of Taxable Wale $ 57.60 1904 (7) SPECIALTY CONTRACTOR <br /> SUB -TOTAL $ 150.51 jInvoice Cost S I - ialty Contractor $ - SUB -TOTAL 5 99.24 <br /> Other Labor - related cost chargeable (A) $ - @5% = $ - ;PLUS Q°d¢ $ - <br /> to This Supplemental Agreement / Work Order (B) $ - @2% = $ - OTAL OF EQUIPMENT <br /> $ 99.24 <br /> Health and Welfare $ 19.95 TOTAL SPECIALTY CONTR. $ - COMPUTATION OF PRIME CONTRACTOR <br /> Pension Fund $ 18.96 , 1904(4) MISC COMPENSATION ALLOWANCE <br /> Other Fringe Benefits $ 0.78 ' ype: i.e. dump fees, permits, etc. (A) No Sub @ 14 - $ _ <br /> Travel (B) No Sub @ 2Ya = $ <br /> 1 <br /> Subsistence TOTAL ALLOWANCE (A +B) $ <br /> TOTAL OF LABOR $ 190.20 TOTAL MISC. COMP. $ - <br /> GRAND TOTAL I $ 370 <br /> Send original and two copies to Central Office with Final Estimate The above report includes only items chargeable to Work Order No. 1 <br /> All coppies must be signed by the engineer, and the Contractor <br /> or their Authorized Agent. <br /> Note: When material is billed on this sheet, receipted Engineer Stantec Consulting Inc. Contractor <br /> invoices must accompany same. �f <br /> See Const. Manual 5- 591.484 for instructions in preperation. By ,[4 _____2_,I <br />
The URL can be used to link to this page
Your browser does not support the video tag.