My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-03-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 1:13:20 PM
Creation date
3/9/2012 1:13:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT - 9 (1 -93) <br /> STATE OF MINNESOTA - D.. ARTMENT OF TRANSPORTATION <br /> SUMMARY OF DAILY FORCE ACCOUNT <br /> WORK ORDER No. 1 Sheet 1 of 1 <br /> S.P. No. 02- 090-01 Fed Proj No. Contract No. 2010 -0601 Contractor / Sub. Veit Construction <br /> For Period from 5/29/2011 to 6/4/2011 Location CRT Segment E (7216 Mill Rd) Engineer Stantec Consulting Inc. <br /> — <br /> LABOR MATERIAL EQUIPMENT RENTAL <br /> # of Men Position Title Hrs OT/Hr Pay Rate Amount No. Kind of Material Rate Amount No. Description Total Hrs Rate Amount <br /> 1 Foreman 1 0 $ 32.27 $ 32.27 4 1 1/2" Rock $ 20.90 $ 83.60 <br /> 1 Laborer 1 0 $ 28.32 $ 28.32 <br /> N <br /> . 1... <br /> SALES TAX $ 5. u6 <br /> SUB-TOTAL $ 89.56 <br /> Total Overtime PLUS 15% $ 13.43 <br /> SUB TOTAL (Taxable Wat es) $ 60.59 TOTAL OF MATERIAL $ 102.99 i <br /> PLUS of Taxable Wale $ 37.57 1904 (7) SPECIALTY CONTRACTOR <br /> SUB -TOTAL X16 Invoice Cost Specialty Contractor $ - SUB -TOTAL $ - <br /> Other Labor - related cost chargeable (A) $ - @5% = $ - PLUS Q� $ - <br /> to This Supplemental Agreement / Work Order (13) $ - @2% = $ - ' TOTAL OF EQUIPMENT $ <br /> Health and Welfare $ 14.25 TOTAL SPECIALTY CONTR. $ - COMPUTATION OF PRIME CONTRACTOR <br /> , <br /> Pension Fund $ 13.52 1904(4) MISC COMPENSATION ALLOWANCE <br /> Other Fringe Benefits $ 1.76 ype: i.e. dump fees, permits, etc. (A) No Sub @ 14z = f $ _ <br /> Travel (B) No Sub @ 2% = $ <br /> Subsistence TOTAL ALLOWANCE (A +B) $ <br /> TOTAL OF LABOR $ 127.69 TOTAL MISC. COMP. .$ <br /> [GRAND TOTAL J $ . . { <br /> Send original and two copies to Central Office with Final Estimate The above report includes only items chargeable to Work Order No. 1 <br /> All coppies must be signed by the engineer, and the Contractor <br /> or their Authorized Agent. <br /> i <br /> Note: When material is billed on this sheet, receipted Engineer S . tec C.nsultin Inc. Contractor — <br /> invoices must accompany same. f / See Const. Manual 5- 591.484 for instructions in preperation. By ilk/ Af <br />
The URL can be used to link to this page
Your browser does not support the video tag.