My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-14 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-03-14 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 1:13:20 PM
Creation date
3/9/2012 1:13:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT TP- (1 -93) <br /> STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION <br /> SUMMARY OF DAILY FORCE ACCOUNT <br /> WORK ORDER No. 1 Sheet 1 of 1 <br /> S.P. No. 02- 090-01 Fed Proj No. Contract No. 2010 -0601 Contractor / Sub. Veit Construction <br /> For Period from 8/21 /2011 to 8/27/2011 Location CRT Sgmnt E Regrade 7228 Mill (EWA 24494) Engineer Stantec Consulting Inc. <br /> LABOR MATERIAL EQUIPMENT RENTAL <br /> # of Men Position Title Hrs OT/Hr Pay Rate Amount No. Kind of Material Rate Amount No. Description Total Hrs Rate Amount <br /> 1 Laborer 4.5 0 $ 30.97 $ 139.37 1 Cat 247B Skid Loader 4.00 $ 26.34 $ 105.36 <br /> 1 Foreman 2.5 0 $ 30.97 $ 77.43 1 Cat 950F Loader 2.00 $63.36 $ 126.72 <br /> N <br /> W <br /> SALES TAX S - <br /> SUB -TOTAL 5 <br /> Total Overtime PLUS 15% $ - <br /> SUB TOTAL (Taxable Wales) $ 216.79 TOTAL OF MATERIAL $ - <br /> PLUS • 't. of Taxable W. _e $ 134.41 1904 SPECIALTY CONTRACTOR <br /> SUB -TOTAL $__ 351.20 Invoice Cost S. • 'alt Contractor $ - SUB -TOTAL $ 232.08 <br /> Other Labor - related cost chargeable (A) $ - @5% = $ - PLUS Q$t _ $ - <br /> to This Supplemental Agreement / Work Order (B) $ - @2% = $ - TOTAL OF EQUIPMENT $ 2S2.08 <br /> Health and Welfare $ 46.55 TOTAL SPECIALTY CONTR. $ - COMPUTATION OF PRIME CONTRACTOR <br /> Pension Fund S 44.24 1904(4) MISC COMPENSATION ALLOWANCE <br /> Other Fringe Benefits $ 1.82 Type: i.e. dump fees, permits, etc. (A) No Sub @ MS _ $ - <br /> Travel (B) , No Sub @ 2S _ $ - <br /> Subsistence - TOTAL ALLOWANCE (A +B) $ - , <br /> TOTAL OF LABOR $ 443 -8.1 TOTAL MISC. COMP. $ - <br /> GRAND TOTAL MA- <br /> Send original and two copies to Central Office with Final Estimate The above report includes only items chargeable to Work Order No. 1 <br /> All coppies must be signed by the engineer, and the Contractor <br /> or their Authorized Agent. <br /> Note: When material is billed on this sheet, receipted Engineer Stantec Consulting Inc. COnttactOt <br /> invoices must accompany same. /17j � See Const. Manual 5- 591.484 for instructions in preperation. By n <br />
The URL can be used to link to this page
Your browser does not support the video tag.