My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-03-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2012 2:39:19 PM
Creation date
3/23/2012 2:38:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec Consulting Services Inc. <br /> 2335 Highway 36 West <br /> St. Paul MN 55113 <br /> Tel: (651) 636 -4600 <br /> Fax: (651) 636 -1311 <br /> Stantec <br /> 2011 Performance Review <br /> Client: City of Centerville. MN • <br /> Comments received from: Date: 03 -14 -2012 <br /> Review performed by: Consolidated Council and Staff <br /> OVERALL PERFORMANCE <br /> Considering Bonestroo /Stantec's overall performance in the last year, please answer the following: <br /> • What have you liked best about our service? What would you like to see us continue? <br /> Communication between engineer and staff was very good during trail project. Project was completed with <br /> minimum issues and with minor extras.. <br /> Communication between engineer and council is generally very good. Engineer is normally well prepared. <br /> • What have you not liked or least valued about our service? <br /> Issues raised at the last minute regarding the street overlay program caused the postponing of the 2012 street <br /> work. Delay was unnecessary, as there were numerous times during the planning where concerns should <br /> have been voiced. This mistake is considered serious and caused many of the following scores to be lowered. <br /> • What suggestions can you share with us to improve our service? <br /> Pay attention to the planning process. Take the initiative to speak up if something that isn't right or you do <br /> not agree with the plan. <br /> Overall, on a scale of 1 -10, how would you rate our services in 2011? 7 (A rating of 1 is <br /> low, 5 is average, and 10 is high) <br /> BONESTROO /STANTEC'S PERSONNEL <br /> On a scale of 1 -10, how would you rate Bonestroo /Stantec's staff in the following areas? Please <br /> write your choice in the space provided (A rating of 1 is low, 5 is average, and 10 is high). <br /> 7 <br /> Responds promptly to your questions <br /> 7 <br /> Provides clear, easily understandable written correspondence <br /> 7 Presents technical information at public meetings in a manner that is clear and <br /> understandable <br /> 7 <br /> Provides information in a timely manner <br /> 6 <br /> Is prepared for public meetings and presentations <br /> 6 <br /> Provides information and presentations that meet your expectations <br /> 6 Participates at staff meetings and public meetings at a level that meets your <br /> expectations <br /> 8 <br /> Understands your overall "Big Picture" vision <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.