My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-11 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2012
>
2012-04-11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2013 1:27:43 PM
Creation date
4/9/2012 10:06:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CENTEiZIaLLE <br />tervif MONTiYL YENGINEER`S REPORT <br />For the April 11, 2012 City Council Meeting <br />Italics = New information. <br />Normal = No change from last report. <br />1. 21 Avenue /Backage Road (000616- 05143 -0). This matter is pending in the court system. <br />2. TE Grant Trail Project (000616- 08165 -0). Construction is complete. Final pay quantity issues are <br />resolved with the exception of traffic control during the state shutdown. Once punch list items are <br />taken care of in the spring, a final payment can be made. <br />1 2008 Downtown Storm Water Improvemennts (000616- 08167-0). The irrigation system was up <br />and running this fall. Next spring, the contractor will be required to restart the system and demonstrate <br />its proper operation again. Once that is complete, the city will take over maintenance and operation. A <br />public viewing of the system is being planned for early next summer. <br />4. 2012 Surface Water Management Plan Update (193802232). A draft of the new Surface Water <br />Management Plan has been created and we are working on adding information to it from various <br />sources Our storm water staff has met with Rice Creels Watershed District for a preliminary discussion <br />on the plan and is following up on their input, A draft, ready for staff review should be completed in <br />Me next few weeks. <br />5. Miscellaneous: <br />The 2012 Street project has been delayed for consideration at a future date. The series of thin <br />overlay projects outlined in the City's updated Pavement Management Plan are to remain on <br />schedule, beginning in 2013. The City's Public Works Staff will begin preparation work for the <br />2013 project in the summer of 2012, by completing: curb replacements, bituminous patching, <br />water main bolt replacements and other such work which should precede a street overlay. <br />
The URL can be used to link to this page
Your browser does not support the video tag.