Laserfiche WebLink
DRAFT DRAFT DRAFT <br /> City Council 2011-06-13 6:48 p.m. <br /> Minutes of Work Session <br /> Present were Mayor Tom Wilharber, Council members Jeff Paar, Steve King, D Love, <br /> and Ben Fehrenbacher. Also present were Mark Statz of Bonestroo & Assoc., City <br /> Attorney Kurt Glaser, Public Works Director Paul Palzer and Finance Director Mike <br /> Jeziorski. <br /> The purpose of the work session was to cover two agenda items, Stormwater Drainage <br /> issues, 2013 Budget. <br /> Stormwater. Council discussed ditch and wet rear yard issues at Meadow Court, <br /> Meadow Circle areas (north of Center Street). Public Works Director, Paul Palzer <br /> recommended that the city clean the westerly 100 feet of the ditch along with the <br /> ditch along Centerville Road to Center Street. This cleaning would cost about $2700, <br /> but would not fully solve the problems in this location. It may reduce the upstream <br /> water level, but it was noted that large areas are plugged up with cat tails which have <br /> impeded drainage. Some members of the council wondered if city staff could dig a <br /> narrow trench to get the water flowing again, but it would likely be a very labor <br /> intensive solution and would not likely help for more than a year or two. Consensus <br /> was to go ahead with the work recommended by staff and then see what impact that <br /> work has, before doing anything further. This will be placed on the next agenda. <br /> Budget 2013. Finance Director, Mike Jeziorski reviewed a draft budget for 2013. The <br /> draft would leave General Fund and bond levies at the present level. Minor increases <br /> to account for inflation were included along with the cost of the street mill and <br /> overlay program. The Council questioned the need for some of the smaller capital <br /> items, such as vehicle replacement, and asked staff to justify the numbers before the <br /> next meeting. <br /> The council discussed whether it was worth the premium of $7,000 per year to insure <br /> :property in the open," such as playground equipment, street lights, hockey rinks and <br /> the like. Approximately $40,000 in damage claims have been paid from the insurance <br /> to the city for damage to these kinds of equipment, over the past ten years. Consensus <br /> was that the insurance coverage should be continued, except staff will see what <br /> premium savings would be to accept a higher deductible. <br /> The budget includes the street mill and overlay program expenditures of <br /> approximately $390,000. Four of the streets were withdrawn from the 2009 Street <br /> Project. Engineer Mark Statz questioned if these streets would be adequately <br /> addressed with a simple mill and overlay. He presented options for consideration <br /> which ran in cost from $55 per foot to $340 per foot. Consensus of the council was <br /> that the intermediate work of full bituminous removal would be the best option for <br /> those streets at an estimated cost of $145 per foot. The capital budget would be fully <br /> 5 <br />