Laserfiche WebLink
<br />\. <br /> <br />'C.AFtfAL PLAN 2001 thru 2005 <br /> <br />City of Centerville, MN <br /> <br />Project # Ol-STR-OOl <br />Project Name Herita~e/LaMotte Drive Reconstruction <br /> <br />Contact Public Works Director <br /> <br />Department Street Department <br /> <br />Type Improvement <br />Useful Life 25 years <br />Category Street Construction <br />Priority 2 Very Important <br /> <br />Description I <br />Reconstruction of Heritage Street west of Cent em lIe Road where the road connects with LaMotte Drive on to the corporate boundary past the entrance of LaMotte Park. <br /> <br />Justification <br /> <br />I <br /> <br />The road is higWy deteriorated. It is predicted that there is little sub-base under this road. The road has been patched on a yearly basis for the last several years. It is <br />prudent to reconstruct this road at the same time that Lino lakes is reconstructing LaMotte Drive to minimize construction vehicle traffic on our new asphalt and for cost <br />efficiencies. <br /> <br />Expenditures <br />PlanninglDesign <br />Construction/Maintenance <br /> <br />2001 <br /> <br />2002 <br />15,000 <br />215,000 <br />230,000 <br /> <br />2003 <br /> <br />2004 <br /> <br />2005 <br /> <br />Total <br />15,000 <br />215,000 <br /> <br />230,000 <br /> <br />Total <br /> <br />Funding Sources <br />General Fund <br />Special Assessments <br /> <br />2001 <br /> <br />2002 <br />175,000 <br />55,000 <br /> <br />230,000 <br /> <br />2003 <br /> <br />2004 <br /> <br />2005 <br /> <br />Total <br />175,000 <br />55,000 <br /> <br />230,000 <br /> <br />Total <br /> <br />I Opemtional ImpacUOther <br />