My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-15 CC WS Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-08-15 CC WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2012 3:56:20 PM
Creation date
8/10/2012 3:56:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t e / z)it ie 1880 :Main Street, Lentervi(k. MN 5. 5038 <br /> 'F SW- bl.2SIT ed 1857 651- 429 -3232 or R'az 651- 429 -8629 <br /> August 10, 2012 <br /> Memo to Council <br /> Re: Agenda for Work Session <br /> Agenda Item #1 - Street Program for 2013 <br /> At your work session, we will ask you to consider which streets to include in the capital <br /> improvement plan for 2013. It probably goes without saying that Peterson Trail, Houle <br /> Circle, Hayfield and Fox Run will be included as these were discussed at your last work <br /> session. We need to discuss them briefly again along with the special assessments that <br /> might be applicable here. <br /> We are asking that you also consider whether the time is right to do some of the other <br /> streets that were deferred from the 2009 Street Project. We are receiving an increasing <br /> number of complaints about Center Street east of Dupre Road. While this was anticipated <br /> to be done in 2015 or so, its quickly deteriorating condition coupled with favorable <br /> financing rates make it worthy of rethought. <br /> Robin Lane and Cardinal Drive in Royal Meadows development were also deferred in <br /> 2009. Paul has looked at these again and feels that the street condition is as good as many <br /> streets that are included in the thin mill and overlay list. The only reason to redo the street <br /> is to make way for the watermain construction. Staff has met with contractors to look for <br /> other options. It may be feasible to construct the watermain in the rear yards. That would <br /> allow the streets to be included in the rotation for mill and overlay, prolonging the life of <br /> the street for at least ten years. At the same time we will see if the watermain and maybe <br /> hookup of the homes. is a candidate for a Community Development Block Grant. We will <br /> do an income survey of the residents to see if it will qualify. <br /> The last significant area of the city needing major street improvements is downtown. If <br /> Anoka County reconstructs Centerville Road next year, the council could consider <br /> constructing watermain and new streets in the downtown area. We will have some cost <br /> estimates for discussion at the meeting. <br /> Bond Financing. We are including in the agenda packet a bond financing run, showing <br /> how the city might finance all of the improvements that are being considered. The <br /> structure of the financing attempts to back -load debt service in a way that allows the <br /> 2004 Improvement Project bond levies to phase out and be replaced by the new debt. <br /> This will allow the improvements to happen without major impact on tax levies. The <br /> financing would include the streets that had been planned for 2013 along with Center <br /> Street and 21' Avenue north of Main. Special assessment income would carry the early <br /> debt pmts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.