Laserfiche WebLink
Stantec <br /> Page 3 of 3 <br /> • Sidewalk <br /> • Decommissioning of Lift Station #3 <br /> • Installation of new gravity sewer <br /> • Reconnection of existing services <br /> • Removal of structure /controls <br /> Fees <br /> Based on the scope of work and scope of project outlined above, the following is a summary of our not -to- <br /> exceed fees. Our work would be billed on a monthly basis, in accordance with our Master Services <br /> Agreement and per our current rate schedule. The values in the table below would not be exceeded without <br /> a change in scope and written permission from city officials. <br /> Phase NTE Fee <br /> Feasibility $12,000 <br /> Plans /Specs, Assist Bidding* $78,000 <br /> Construction Phase $26,000 <br /> Project Close -out Phase $11,000 <br /> Total $127,000 <br /> *These fees are based on the assumption that the curb will need to be replaced in the Center Street area. <br /> If services beyond those discussed in this scope of work become necessary or if the scope of the construction <br /> project changes, we will present this information and request authorization for the additional compensation, <br /> as appropriate. Possible services which may be needed, but are not part of the current authorization are: <br /> • Easements (sketches, descriptions) <br /> • Property Iron replacement <br /> • Funding applications or additional requirements of funding agencies <br /> Sincerely, <br /> STANTEC CONSULTING SERVICES, INC. <br /> ' 2 _ <br /> Mark Statz, PE <br /> City Engineer <br /> 651 - 604 -4709 <br /> Attachments: Figures from Initial Feasibility Report <br /> 77, <br />