Laserfiche WebLink
DRAFT DRAFT DRAFT <br /> City Council 2011-08-15 6:30 p.m. <br /> Minutes of Work Session <br /> Present were Mayor Tom Wilharber, Council members Jeff Paar, Steve King, and Ben <br /> Fehrenbacher. Also present were Mark Statz of Bonestroo & Assoc., City Attorney Kurt <br /> Glaser, Public Works Director Paul Palzer and Finance Director Mike Jeziorski. Absent <br /> at the beginning of the meeting D Love, who arrived at 8:00 p.m. <br /> The purpose of the work session was to cover a variety of agenda items: <br /> 1. Street Program for 2013. <br /> Peterson Trail, etc. Staff reviewed the list of possible street improvements for 2013. <br /> Consensus was to do a full bituminous surface removal and replacement on Peterson <br /> Trail from Main Street to Fox Run, Fox Run westerly from Peterson Trail to its <br /> terminus in the cul de sac, Houle Circle from Peterson Trail to its terminus in the cul <br /> de sac and Hayfield Road from Mill Road to Peterson Trail. Estimated assessments <br /> for these streets in the 2009 Improvement were about $4200 per lot. The current plan <br /> modifies the improvement and the estimate is now about $2500 per lot. Consensus <br /> was to move this work forward. <br /> Center Street. Staff requested that the Council consider putting Center Street on the <br /> improvement list, due to its severely deteriorated condition and the fact that it was <br /> deferred from the 2004 Improvement and again in 2009. It was proposed that <br /> watermain be installed in Center Street but paid for from the Water Fund and then <br /> reimbursed through connection fees when properties hook up to the service. Staff <br /> also suggested installing a gravity sewer line in place of the lift station that serves the <br /> street and to bid service line installation into homes to allow homeowners the option <br /> of hooking up to water with all of the costs specially assessed. The council discussed <br /> installing a trail or sidewalk along Center Street between Dupre and 20 Avenue. <br /> Paul Palzer suggested that the street lights on Center Street may be owned by the <br /> City. If that turns out to be the case, he would like to replace them with street lights <br /> owned by the utility company. It was noted that bolts on hydrants and valves, which <br /> are often severely corroded due to certain soil conditions, would be replaced in <br /> advance of the improvement. Council also discussed whether mail boxes, which will <br /> be removed during construction, should be grouped at reinstallation as required by <br /> city code. Consensus was to replace any city owned street lights with utility owned <br /> lights, but that mailboxes would be put back in their present locations. <br /> Council member Fehrenbacher suggested that the council wait until 2014 or 2015 to <br /> reconstruct Center Street. Consensus was that Center Street would be included in the <br /> street program for 2013 and that sidewalks would be included initially. They could be <br /> removed if there are significant objections during the public input stage of the <br /> process. <br />