My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-10-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2012 2:39:20 PM
Creation date
10/5/2012 2:39:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ant& <br /> CENTERVILLE SURFACE WATER MANAGEMENT PLAN <br /> CAPITAL IMPROVEMENTS PLAN <br /> September 2012 <br /> These two neighborhoods are due for street reconstructions with the installation of water <br /> mains. This type of project may require the installation of rain gardens or other <br /> infiltration features. <br /> Estimated Project Costs: $200,000 <br /> 3. Back Yard Drainage Improvements <br /> Various small projects to improve back yard drainage around the City. <br /> Estimated Project Costs: $100,000 (varies between $5,000 - $20,000 each) <br /> One Team. Infinite Solutions. <br /> 8.24 <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.