Laserfiche WebLink
CITY OF CENTERVILLE - 2013 STREET AND UTILITY IMPROVEMENT PROJECT <br /> Sanitary Sewer Improvements <br /> Since the City has chosen to make an investment in its streets, it is important that <br /> everything underneath those streets be checked to ensure the street investment is not <br /> compromised by the future need to repair infrastructure below. The existing conditions <br /> of the sanitary sewer system were evaluated through the examination of the City's <br /> regularly scheduled sewer televising program. The reports produced from these video <br /> inspections were analyzed for deficiencies including mineral deposits, open or offset <br /> joints, sagged, cracked, or fractured pipe. Recommendations for the rehabilitation of the <br /> sanitary sewer system are included below. Repairs are proposed based on the severity <br /> of the problem and the need for that problem to be fixed via open -cut methods. Issues <br /> which could be repaired with in -line technology have not been included since their repair <br /> can be completed at any time, without disturbing the pavement. <br /> REPLACING AND REPAIRING PIPE <br /> A short section of damaged pipe was identified on Peterson Trail, just north of Houle <br /> Circle. This pipe should be repaired by city crews prior to the construction of this project. <br /> City of Centerville Project No: 193801520 <br /> 2013 Street and Utility Improvement Project , Stantec Page e 9 <br />