Laserfiche WebLink
CITY OF CENTERVILLE - 2013 STREET AND UTILITY IMPROVEMENT PROJECT <br /> Cost Estimates <br /> Detailed cost estimates have been prepared for all improvements identified in the <br /> previous sections. These estimates can be seen in Appendix B. The estimated cost per <br /> centerline linear foot of each of the improvement options can be seen below. <br /> TABLE 6- SUMMARY OF ESTIMATED COSTS <br /> Area Scope Total Cost <br /> A Center Street, Ivy Ct., Sumac Ct. $785,000 <br /> B Peterson, Houle, Fox Run, Hayfield $325,000 <br /> Subtotal Estimated Construction Cost (Basic Improvements) $1,110,000 <br /> Construction Contingency (5 %) 55,000 <br /> Engineering, Administrative, Fiscal (30 %) $335,000 <br /> (Eng. Design, Inspection, Material Testing, Appraisals, Permits, <br /> Easements, Construction Staking, Bond Issue and other costs) <br /> Total Estimated Project Costs $1,500,000 <br /> Lift Station No. 3 Abandonment $106,000 <br /> *Water Service Connections into 36 Homes/Well abandonment - $90,000 <br /> Estimate based on $2500 /home. <br /> * *Off- project Water - Service Connections into 25 Homes - $75,000 <br /> Estimate based on $3000 /home <br /> Total Potential Costs $1,771,000 <br /> *Assumes all homes in the Center Street Area opt for this service. <br /> * *Estimate of 25 homes based on previous level of response. <br /> City of Centerville Project No: 193801520 <br /> 2013 Street and Utility Improvement Project J+ StanteC Page 15 <br />