Laserfiche WebLink
September 27th, 2012 <br /> c� <br /> A <br /> Proposal p INDUSTRIES <br /> To City of Centerville Public Works attention Paul Palzer <br /> Supply materials and labor for salt shed per drawing and specifications. <br /> 22'w X 24'1 with 2' overhang on 24' sides only <br /> T111 %a "X 8' siding and soffits, nailed with ring shank TLN nails <br /> 14`sidewalls with treated bottom plate <br /> Fire blocking at 4' to keep salt out of wall cavity <br /> %" plywood on roof and 4' high on interior <br /> 15# felt with standard shingles (no ice and water) white D edge on 4 sides <br /> 2 "X6" facia all 4 sides <br /> 14'2 "wide 13'0" tall Ideal C4ST 24 gauge white ribbed steel non insulated, 2" headroom, weather seal <br /> manual operation overhead door (no glass) <br /> 20) /2" Wedge bolt anchors in plate <br /> Recommend 1 W' angle iron on out side of wall, bolted to cement, to backup wall when loader pushes <br /> against it. <br /> Materials 8,175 <br /> Door and installation 2,360 <br /> Labor 5,400 <br /> Total cost for construction 15,935 <br /> Thank you for considering Friberg Industries for your project! <br /> Scott Friberg <br /> Friberg Industries <br /> 14255 Furman Street NE <br /> Forest Lake, MN 55025 <br /> 612 - 369 -2751c <br />