Laserfiche WebLink
CITY OF CENTERVILLE - 2013 STREET AND UTILITY IMPROVEMENT PROJECT <br /> Table of Contents <br /> Letter of Transmittal 1 <br /> Table of Contents 2 <br /> Executive Summary 3 <br /> Introduction 6 <br /> Proposed Improvements 8 <br /> Area A 8 <br /> Street Improvements - Full Reconstruction of the Street Section 8 <br /> Area B 9 <br /> Street Improvements - Full Bituminous Removal and Replacement 9 <br /> Future Improvements 10 <br /> Area C 10 <br /> Area D 10 <br /> Area E 10 <br /> Storm Sewer Improvements 11 <br /> Proposed Pipe Installations 11 <br /> Storm Sewer Crossing Issues 11 <br /> Proposed Storm Water Management 11 <br /> Sanitary Sewer Improvements 12 <br /> Replacing and Repairing Pipe 12 <br /> Water Main Improvements 13 <br /> Water Main Extensions 13 <br /> • Water Service Stub installation 13 <br /> Water Service Connection to Home 13 <br /> Bolt Replacement 14 <br /> Pathway and Sidewalk Improvements 15 <br /> Lift Station #3 16 <br /> Existing Conditions 16 <br /> Proposed Improvements 16 <br /> Operation and Maintenance Costs 17 <br /> Other Costs 17 <br /> Recommended Solution 17 <br /> Cost Estimates /Funding 18 <br /> Assessments 19 <br /> Project Schedule 21 <br /> Conclusions and Recommendations 22 <br /> Appendix 23 <br /> • <br /> City of Centerville S 1 a Project No: 193801520 <br /> 2013 Street and Utility Improvement Project •�i� Page 2 <br /> 33 <br />