Laserfiche WebLink
Project Costs <br /> The following table is a summary of the project costs based on the recommended <br /> improvements: <br /> TABLE 1 - PROJECT COSTS <br /> Area Scope Total Cost Funding Source <br /> Street Improvements <br /> A — Center Street Area Full Street Reconstruction $911,000 Bonds /Assessments <br /> B — Houle, Fox, Full Bituminous Removal and $497,000 Bonds /Assessments <br /> Hayfield, Peterson Replacement <br /> Total Street Costs $1,408,000 <br /> Water Main <br /> A — Center Street Area Install Water Main and Services* $261,000 Water Fund <br /> A — Center Street Area Services into Homes (on project)** $45,000 Bonds /Assessments <br /> Various Locations Services into Homes (off project) $178,750 Bonds /Assessments <br /> Total Water System Costs $484,750 <br /> Sanitary Sewer <br /> A — Center Street Area Eliminate LS #3 $143,000 Sewer Fund <br /> Total Sewer System Costs $143,000 <br /> Total Potential Costs $2,035,750 <br /> *Based on open cutting of water main in conjunction with full street reconstruction. <br /> * *Assumes half of homes in the Center Street Area opt for this service at $2,500 /home. <br /> • ** *Estimate of 25 homes @ $7,150 /home based on previous pricing and level of <br /> response. <br /> • <br /> City of Centerville Project No: 193801520 <br /> 2013 Street and Utility Improvement Project Page 4 <br /> 35 <br />