Laserfiche WebLink
CITY OF CENTERVILLE - 2013 STREET AND UTILITY IMPROVEMENT PROJECT <br /> Cost Estimates /Funding <br /> Detailed cost estimates have been prepared for all improvements identified in the <br /> previous sections. These estimates can be seen in the Appendix. <br /> TABLE 8- SUMMARY OF ESTIMATED COSTS <br /> Area Scope Total Cost Funding Source <br /> Street Improvements <br /> A — Center Street Area Full Street Reconstruction $911,000 Bonds /Assessments <br /> B — Houle, Fox, Full Bituminous Removal and $497,000 Bonds /Assessments <br /> Hayfield, Peterson Replacement <br /> Total Street Costs $1,408,000 <br /> Water Main <br /> A — Center Street Area Install Water Main and Services $261,000 Water Fund <br /> Services into Homes (on project)* $45,000 Bonds /Assessments <br /> Services into Homes (off project) ** $178,750 Bonds /Assessments <br /> Total Water System Costs $484,750 <br /> Sanitary Sewer <br /> A — Center Street Area Eliminate LS #3 $143,000 Sewer Fund <br /> Total Sewer System Costs $143,000 <br /> Total Potential Costs $2,035,750 <br /> *Assumes half of homes in the Center Street Area opt for this service at $2,500 /home. <br /> * *Estimate of 25 homes @ $7,150 /home based on previous level of response. <br /> • <br /> City of Centerville _ Project No: 193801520 <br /> 2013 Street and Utility Improvement Project � Page 18 <br /> 49 <br />