Laserfiche WebLink
CITY OF CENTERVILLE <br /> rm <br /> MONTHLY ENGINEER'S REPORT <br /> termite <br /> • For the November 14, 2012 City Council Meeting <br /> 4 £stadfichr4f 1167 <br /> Italics = New information. <br /> Normal = No change from last report. <br /> 1. TE Grant Trail Project (000616- 08165 -0). Final payment paperwork is being processed with the <br /> County. <br /> 2. 2008 Downtown Storm Water Improvements (000616- 08167 -0). A record plan of the project <br /> is being produced. <br /> 3. 2013 Street and Utility Improvements (193801520). The feasibility Report was reviewed by the <br /> City Council at its last meeting. The council then called for a public hearing to be held on Wednesday, <br /> November 28 , at 6:30 PM in the Council Chambers. The proposed scope of the project includes full <br /> bituminous removal and replacement for the Hayfield, Fox Run, Peterson, Houle area and full <br /> reconstruction of the Center Street area including the installation of water main. The sanitary sewer lift <br /> station on Center Street will not be eliminated as originally proposed. <br /> 4. Miscellaneous: <br /> • City Staff again met with Anoka County staff and discussed the design of improvements to <br /> Centerville Road (CSAH 21). The City will need to let Anoka County know their preference on a <br /> few items, including our intentions with regard to streetscaping and other improvements on <br /> • Centerville Road between Heritage St. and Main Street. The plan is taking shape and will be <br /> ready for public input in late 2012 or early 2013. <br /> • <br /> 35 <br />