My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2024
>
2012
>
2012-11-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2012 1:01:00 PM
Creation date
11/21/2012 1:00:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CENTERVILLE <br /> rm <br /> MONTHLY ENGINEER'S REPORT <br /> termite <br /> • For the November 14, 2012 City Council Meeting <br /> 4 £stadfichr4f 1167 <br /> Italics = New information. <br /> Normal = No change from last report. <br /> 1. TE Grant Trail Project (000616- 08165 -0). Final payment paperwork is being processed with the <br /> County. <br /> 2. 2008 Downtown Storm Water Improvements (000616- 08167 -0). A record plan of the project <br /> is being produced. <br /> 3. 2013 Street and Utility Improvements (193801520). The feasibility Report was reviewed by the <br /> City Council at its last meeting. The council then called for a public hearing to be held on Wednesday, <br /> November 28 , at 6:30 PM in the Council Chambers. The proposed scope of the project includes full <br /> bituminous removal and replacement for the Hayfield, Fox Run, Peterson, Houle area and full <br /> reconstruction of the Center Street area including the installation of water main. The sanitary sewer lift <br /> station on Center Street will not be eliminated as originally proposed. <br /> 4. Miscellaneous: <br /> • City Staff again met with Anoka County staff and discussed the design of improvements to <br /> Centerville Road (CSAH 21). The City will need to let Anoka County know their preference on a <br /> few items, including our intentions with regard to streetscaping and other improvements on <br /> • Centerville Road between Heritage St. and Main Street. The plan is taking shape and will be <br /> ready for public input in late 2012 or early 2013. <br /> • <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.