My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-12-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2012 1:41:06 PM
Creation date
12/7/2012 1:38:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Centerville <br /> Council Meeting Minutes <br /> November 28, 2012 <br /> Engineer Statz stated that even if Council approves the resolution, the City is not required <br /> to proceed until awarding a contract for construction. <br /> Lengthy discussion was had regarding the content of the plans and specifications, <br /> whether water should be included in them, the previous removal of the reconstruction of <br /> Center Street, Ivy Court and Sumac Court from the 2009 Street Improvement Project per <br /> resident request, a deadline date for connection, Council's desire to accept resident input <br /> but also provide long -term consideration for the City and residents as a whole. <br /> Consensus of the Council was to order the 2013 Street Improvement Project with the <br /> understanding that throughout the process prior to the Assessment Hearing Council could <br /> modify any scope of the project if they desired. <br /> Council Member Paar questioned Engineer Statz as to the feeling of whether bids are <br /> being received well within the parameters of the feasibility study estimates. Engineer <br /> Statz stated that bids that he has been receiving are very similar to the estimates with a <br /> fair amount of work being available for contractors. <br /> Motion was made by Council Member Paar, seconded by Council Member <br /> Fehrenbacher to adopt Res. #12 -028 Ordering the 2013 Street Improvement Proieet <br /> as presented. <br /> Council Member Paar again stated that the Council is not making the final decision on <br /> the project at this time and that changes in the project could occur subsequent to <br /> receiving bids similar to the 2009 Street Improvement Project where the scope of the <br /> project was modified and bid in two separate intervals. <br /> All in favor. Motion carried unanimously. <br /> Consensus of the Council was to direct staff to bring back for the next meeting, a draft <br /> ordinance amending City Code, Chapter 51.08, (D) which would modify the existing <br /> language to include "except where water is made available by the City after January 1, <br /> 2013 being required to connect no later than December 31, 2021." <br /> 3. Ticket Education Program <br /> a. Agreement <br /> Attorney Glaser stated that the test period of six (6) months has lapsed for the program, <br /> gave a brief overview of the on -line educational program offered in addition to all other <br /> legal recourses available for similar violations, reviewed statistics obtained from users, <br /> reported that the City of Circle Pines had approved the program for a three (3) year <br /> period as similar to tonight's agreement before Council and that the City of Lexington <br /> would be considering it shortly. <br /> Lengthy discussion ensued regarding the program, revenue generation to the City's <br /> General Fund, the Centennial Police Department funding through the City's General <br /> Page 9 of 12 <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.