Laserfiche WebLink
CITY OF CENTERVILLE <br /> tervitt MONTHL Y ENGINEER'S REPORT <br /> E,stob(LOcd <br /> For the December 12, 2012 City Council Meeting <br /> ltd'► <br /> Italics = New information. <br /> Normal = No change from last report. <br /> 1. TE Grant Trail Project (000616- 08165 -0). Final payment paperwork is being processed with the <br /> County. <br /> 2. 2008 Downtown Storm Water Improvements (000616- 08167 -0). A record plan of the project <br /> is being produced. <br /> 3. 2013 Street and Utility Improvements (193801520). The Public Improvement Hearing was held <br /> at the last City Council meeting. Input from the public was received The plans and specifications were <br /> ordered and are being completed. Our preliminary schedule has us taking bids in March, having an <br /> Assessment Hearing in April and considering award of the contract shortly thereafter. <br /> 4. CSAH 21 Reconstruction (193801639). City staff met with Anoka County staff to review the <br /> revised plan for the reconstruction of CSAH 21. The project has been scaled back significantly from the <br /> original layout which had included left turn lanes, urban section and trails. At the last City Council <br /> meeting, we were directed to look at some issues related to the viability of an urban section from <br /> Heritage to Meadow Lane. The results of that investigation will be shared at an upcoming meeting <br /> along with some suggested comments to submit to Anoka County as the City's input on the design. <br /> 5. Miscellaneous: <br /> • None <br /> -46- <br />